Two-stage clustering algorithm for block aggregation in open pit mines M Tabesh, H Askari-Nasab Mining Technology 120 (3), 158-169, 2011 | 128 | 2011 |
A multiple objective transportation problem approach to dynamic truck dispatching in surface mines AM Afrapoli, M Tabesh, H Askari-Nasab European Journal of Operational Research 276 (1), 331-342, 2019 | 86 | 2019 |
Automatic creation of mining polygons using hierarchical clustering techniques M Tabesh, H Askari-Nasab Journal of Mining Science 49, 426-440, 2013 | 61 | 2013 |
A multi–step approach to long–term open–pit production planning M Tabesh, C Mieth, H Askari–Nasab International Journal of Mining and Mineral Engineering 5 (4), 273-298, 2014 | 45 | 2014 |
A stochastic hybrid simulation-optimization approach towards haul fleet sizing in surface mines A Moradi Afrapoli, M Tabesh, H Askari-Nasab Mining Technology 128 (1), 9-20, 2019 | 41 | 2019 |
Clustering mining blocks in presence of geological uncertainty M Tabesh, H Askari-Nasab Mining Technology 128 (3), 162-176, 2019 | 35 | 2019 |
A comprehensive approach to strategic open pit mine planning with stockpile consideration M Tabesh, H Askari-Nasab, R Peroni Proceedings of the Thirty-seventh international symposium on applications of …, 2015 | 26 | 2015 |
Creating mining-cuts using hierarchical clustering and tabu search algorithms H Askari-Nasab, M Tabesh, MM Badiozamani Mining Optimization Laboratory, 22, 2010 | 21 | 2010 |
A simulation model for estimation of mine haulage fleet productivity S Upadhyay, M Tabesh, M Badiozamani, H Askari-Nasab Proceedings of the 28th International Symposium on Mine Planning and …, 2020 | 18 | 2020 |
A simulation-based algorithm for solving surface mines’ equipment selection and sizing problem under uncertainty SP Upadhyay, M Tabesh, MM Badiozamani, A Moradi Afrapoli, ... CIM Journal 12 (1), 36-46, 2021 | 17 | 2021 |
A mathematical programming model for open pit short-term production scheduling H Askari-Nasab, H Eivazy, M Tabesh, MM Badiozamani SME Annual Meeting, Denver, Colorado, USA SME. Vol., No. Issue,(2011 of …, 2011 | 15 | 2011 |
Alignment of short-term and operational plans using discrete event simulation H Askari-Nasab, E Torkamani, MM Badiozamani, M Tabesh SME Annual Meeting, 19-22, 2012 | 13 | 2012 |
Near-face stockpile open pit mining: a method to enhance NPV and quality of the plant throughput H Gong, M Tabesh, A Moradi Afrapoli, H Askari-Nasab International Journal of Mining, Reclamation and Environment 37 (3), 200-215, 2023 | 11 | 2023 |
Simulation and optimization in open pit mining SP Upadhyay, H Askari-Nasab, M Tabesh, MM Badiozamani Proceedings of the Application of Computers and Operations Research in the …, 2015 | 10 | 2015 |
Simulation optimisation of mine operational plans H Askari-Nasab, SP Upadhyay, E Torkamani, M Tabesh, ... Orebody Modelling and Strategic Mine Planning Symposium, Perth, WA Australia, 2014 | 10 | 2014 |
Discrete Event Simulation of Truck-Shovel Operations in Open Pit Mines1 M Tabesh, SP Upadhyay, H Askari-Nasab MOL Annu. Rep. Seven 7, 77-93, 2016 | 9 | 2016 |
A two-stage simultaneous optimization of NPV and throughput in production planning of open pit mines M Tabesh, AM Afrapoli, H Askari-Nasab Resources Policy 80, 103167, 2023 | 7 | 2023 |
A transportation problem-based stochastic integer programming model to dispatch surface mining trucks under uncertainty AM Afrapoli, M Tabesh, H Askari-Nasab Proceedings of the 27th International Symposium on Mine Planning and …, 2019 | 7 | 2019 |
Aggregation and mathematical programming for long-term open Pit production planning M Tabesh | 6 | 2015 |
Open pit production planning using controlled pushbacks and aggregates M Tabesh, C Mieth, H Askari-Nasab Proceedings of the 23rd World Mining Congress, 2013 | 6 | 2013 |