Analisis rantai nilai (value chain) pada komoditas jagung A Lihawa, H Uloli, A Rasyid Jambura Industrial Review (JIREV) 1 (2), 94-103, 2021 | 17 | 2021 |
Pengaruh Usia dan Lama Kerja terhadap Kelelahan Kerja pada Pekerja Pembuat Batako di Gorontalo IH Lahay, E Wolok, H Hasan, H Uloli Prosiding SENTRA (Seminar Teknologi dan Rekayasa), 64-67, 2019 | 12 | 2019 |
Analisis Keseimbangan Lintasan Lini Produksi Tepung Kelapa Dengan Metode Ranked Positional Weight Dan Region Approach R Moonti, H Uloli, A Rasyid Jambura Industrial Review (JIREV), 1-10, 2022 | 10 | 2022 |
Perencanaan Persediaan Produk Keripik Pisang Dengan Menggunakan Metode Distribution Requirement Planning (DRP) Di UKM Flamboyan Gorontalo W Pua, I Wunarlan, H Uloli Jambura Industrial Review (JIREV) 1 (2), 74-82, 2021 | 10 | 2021 |
Development and validation of learning media on combustion engine MR Badu, HB Uno, RDR Dako, H Uloli Journal of Physics: Conference Series 1833 (1), 012024, 2021 | 8 | 2021 |
PENGARUH VARIASIJENIS BAHAN BAKAR TERHADAP EMISI GAS BUANG PADA SEPEDA MOTOR VIXION 155cc VVA TIPE INJEKSI TAHUN 2018 M Sanusi, H Uloli, MY Arafat SemanTECH (Seminar Nasional Teknologi, Sains Dan Humaniora) 1 (1), 202-209, 2019 | 5 | 2019 |
Analisis Perencanaan Produksi pada PT. Davinci Airindo Menggunakan Metode Agregate Planning MAD Matiro, A Rasyid, H Uloli, I Wunarlan Jambura Industrial Review (JIREV), 21-30, 2022 | 4 | 2022 |
Pengembangan media pembelajaran interaktif berbasis animasi pada kelistrikan bodi kendaraan MEW Ismail, MY Arafat, H Uloli Steam Engineering 4 (2), 114-124, 2023 | 2 | 2023 |
Pengembangan Media Pembelajaran Alat Peraga Continously Variable Transmission (CVT) Sepeda Motor pada Mata Kuliah Teknologi Sepeda Motor GMSA Candra, H Uloli, FA Rauf Jambura Journal of Engineering Education 1 (1), 2022 | 2 | 2022 |
Penjadwalan Kapasitas Produksi Roti menggunakan Metode Rough Cut Capacity Planning di UMKM Cita Rasa Gorontalo AK Abdullah, IH Lahay, H Uloli Jurnal Teknik Industri Terintegrasi (JUTIN) 7 (1), 394-403, 2024 | 1 | 2024 |
Analisis Mitigasi Risiko Penjualan Kopi Roasted Pada UKM Puntang Coffee Menggunakan Metode House of Risk FO Yunus, T Lasalewo, H Uloli JAMBURA: Jurnal Ilmiah Manajemen dan Bisnis 6 (1), 257-268, 2023 | 1 | 2023 |
Analisis Pemakaian Bahan Bakar pada Mesin MAK 8M453 Unit 5 PLTD Telaga H Uloli, JD Giu, A Sulaeman Jurnal Teknik 16 (1), 1-11, 2018 | 1 | 2018 |
PENILAIAN POSTUR KERJA PADA PEKERJA PEMBUAT BATAKO DI GORONTALO IH Lahay, H Hasanuudin, H Uloli Prosiding SENTRA (Seminar Teknologi dan Rekayasa), 2017 | 1 | 2017 |
PENGUKURAN KINERJA RANTAI PASOK MENGGUNAKAN METODE SCOR DI UMKM ZOELLEN SAGELA GORONTALO A Rasyid, SB Sulanda, H Hasanuddin, H Uloli, IH Lahay JAMBURA: Jurnal Ilmiah Manajemen dan Bisnis 7 (2), 876-885, 2024 | | 2024 |
Identification of Water Hyacinth Fiber (Eichornia Crassipes) and Polyethylene Terephthalate Waste as an Alternative Material S Junus, RF Uloli, FA Rauf, I Renreng, M Syahid, A Hayat, H Uloli Journal of Physics: Conference Series 2739 (1), 012027, 2024 | | 2024 |
PENGAJARAN KOSAKATA BAHASA INGGRIS BAGI SISWA SEKOLAH DASAR DI SDN 2 KABILA BONE, KABUPATEN BONE BOLANGO H Badu, H Uloli Jurnal Pengabdian Teknik Industri 2 (2), 72-77, 2023 | | 2023 |
UPAYA MENINGKATKAN KESEJAHTERAAN MASYARAKAT NELAYAN PESISIR DESA LOPO MELALUI PENGEMBANGAN BENGKEL JASA REPARASI MESIN KETINTING H Uloli, MY Arafat, E Larosa, M Pratiwi, S Pramudibyo Jurnal Pengabdian Teknik Industri 2 (2), 64-71, 2023 | | 2023 |
PENGENDALIAN PERSEDIAAN DI PT. AWET SARANA SUKSES MENGGUNAKAN METODE ABC DAN EOQ S Sintiana, A Rasyid, H Uloli Jambura Industrial Review (JIREV) 3 (2), 18-25, 2023 | | 2023 |
ANALISIS PENYEBAB KERUSAKAN PADA MESIN PRESS (200A-3 OIL EXPELLER) MENGGUNAKAN METODE FMEA DI PT. XYZ WS Masri, S Junus, H Uloli Jambura Industrial Review (JIREV) 3 (2), 01-09, 2023 | | 2023 |
ANALYSIS OF THE DIGITAL COMPETENCE OF MACHINING VOCATIONAL SCHOOL TEACHERS IN GORONTALO H Uloli, MR Badu Jurnal Pendidikan Teknik Mesin 10 (1), 31-39, 2023 | | 2023 |