Safety risk assessment using analytic hierarchy process (AHP) during planning and budgeting of construction projects S Aminbakhsh, M Gunduz, R Sonmez Journal of safety research 46, 99-105, 2013 | 514 | 2013 |
Construction labor productivity modeling with neural networks R Sonmez, JE Rowings Journal of construction engineering and management 124 (6), 498-504, 1998 | 260 | 1998 |
A smart contract system for security of payment of construction contracts S Ahmadisheykhsarmast, R Sonmez Automation in construction 120, 103401, 2020 | 209 | 2020 |
Conceptual cost estimation of building projects with regression analysis and neural networks R Sonmez Canadian Journal of Civil Engineering 31 (4), 677-683, 2004 | 202 | 2004 |
A hybrid genetic algorithm for the discrete time–cost trade-off problem R Sonmez, ÖH Bettemir Expert Systems with Applications 39 (13), 11428-11434, 2012 | 162 | 2012 |
Parametric range estimating of building costs using regression models and bootstrap R Sonmez Journal of construction Engineering and Management 134 (12), 1011-1016, 2008 | 118 | 2008 |
Discrete particle swarm optimization method for the large-scale discrete time–cost trade-off problem S Aminbakhsh, R Sonmez Expert Systems with Applications 51, 177-185, 2016 | 113 | 2016 |
Quantiative methodology for determination of cost contingency in international projects R Sonmez, A Ergin, MT Birgonul Journal of Management in Engineering 23 (1), 35-39, 2007 | 108 | 2007 |
Range estimation of construction costs using neural networks with bootstrap prediction intervals R Sonmez Expert systems with applications 38 (8), 9913-9917, 2011 | 86 | 2011 |
Hybrid genetic algorithm with simulated annealing for resource-constrained project scheduling ÖH Bettemir, R Sonmez Journal of Management in Engineering 31 (5), 04014082, 2015 | 82 | 2015 |
Predesign cost estimation of urban railway projects with parametric modeling R Sonmez, B Ontepeli Journal of Civil Engineering and management 15 (4), 405-409, 2009 | 65 | 2009 |
BIM integrated smart contract for construction project progress payment administration R Sonmez, S Ahmadisheykhsarmast, AA Güngör Automation in Construction 139, 104294, 2022 | 56 | 2022 |
Pareto front particle swarm optimizer for discrete time-cost trade-off problem S Aminbakhsh, R Sonmez Journal of Computing in Civil Engineering 31 (1), 04016040, 2017 | 50 | 2017 |
Backward-forward hybrid genetic algorithm for resource-constrained multiproject scheduling problem R Sonmez, F Uysal Journal of Computing in Civil Engineering 29 (5), 04014072, 2015 | 49 | 2015 |
A support vector machine method for bid/no bid decision making R Sonmez, B Sözgen Journal of Civil Engineering and Management 23 (5), 641-649, 2017 | 41 | 2017 |
Blockchain in project management: a systematic review of use cases and a design decision framework R Sonmez, FÖ Sönmez, S Ahmadisheykhsarmast Journal of Ambient Intelligence and Humanized Computing, 1-15, 2023 | 28 | 2023 |
Impact of occasional overtime on construction labor productivity: quantitative analysis R Sonmez Canadian Journal of Civil Engineering 34 (7), 803-808, 2007 | 23 | 2007 |
Hybrid optimization method for large-scale multimode resource-constrained project scheduling problem R Sonmez, M Gürel Journal of Management in Engineering 32 (6), 04016020, 2016 | 22 | 2016 |
Review of conceptual cost modeling techniques R Sonmez AACE International Transactions, ES71, 2005 | 21 | 2005 |
Activity uncrashing heuristic with noncritical activity rescheduling method for the discrete time-cost trade-off problem R Sonmez, S Aminbakhsh, T Atan Journal of Construction Engineering and Management 146 (8), 04020084, 2020 | 18 | 2020 |