Analysis of Overall equipment effectiveness (OEE) on engine power plant performance D Nusraningrum, Z Arifin KnE Social Sciences, 2018 | 12 | 2018 |
Penerapan Sistem Manajemen Keselamatan Dan Kesehatan Kerja (Smk3) Untuk Meminimalkan Kecelakaan Kerja Dengan Metode Fault Tree Analysis Di Pt. Sumber Sukses Ganda Z Arifin PROFISIENSI J. Progr. Stud. Tek. Ind 10 (1), 68-76, 2022 | 8 | 2022 |
Analisa Dan Desain Sistem Informasi Manajemen Dengan Metode SDLC (System Development Life Cycle) Guna Mengurangi Waktu Kerusakan Mesin Welding S Rahmadani, Z Arifin, E Sumarya PROFISIENSI: Jurnal Program Studi Teknik Industri 7 (1), 16-24, 2019 | 7 | 2019 |
Menurunkan Jumlah Kecacatan Produk Pada Proses Produksi Dengan Menggunakan Metode Six Sigma Dan Pengendalian Statistik Di Pt. Xyz Indonesia Z Arifin, BD Leonanda Sigma Teknika 4 (1), 106-114, 2021 | 6* | 2021 |
Analisa Dan Desain Sistem Informasi Manajemen Dengan Metode Sdlc (System Development Life Cycle) Guna Mengurangi Waktu Kerusakan Mesin Welding SR Rahadani, Z Arifin, E Sumarya PROFISIENSI: Jurnal Program Studi Teknik Industri 9 (2), 291-297, 2021 | 5 | 2021 |
Pengendalian Kualitas Dengan Metode Nominal Group Teknology (NGT) dan Poka-Yoke untuk Mengurangi Jumlah Cacat Panel Assy di PT. XYZ Z Arifin PROFISIENSI: Jurnal Program Studi Teknik Industri 7 (2), 76-85, 2019 | 4 | 2019 |
Program Training Pengembangan Kewirausahaan Untuk Meningkatkan Kemampuan Pengelolaan Bisnis Usaha Kecil dan Menengah (UKM) Z Arifin SIGMA TEKNIKA 2 (1), 57-67, 2019 | 3 | 2019 |
Pengendalian Reject Contamination On Marking Pada Proses Mark Scan Pack (Msp) Dengan Pendekatan Six Sigma (Studi Kasus Di Pt. Infineon Technologies Batam) The Control Of Reject … IRP Siallagan, D Redantan, Z Arifin PROFISIENSI: Jurnal Program Studi Teknik Industri 4 (1), 2016 | 3 | 2016 |
Perancangan Ulang Tata Letak Stasiun Kerja Dengan Metode Systematic Lay Out Planning (Studi Kasus di PT. Infineon Technologies Batam) P Rahardjo, Z Arifin, A Purbasari PROFISIENSI: Jurnal Program Studi Teknik Industri 2 (2), 2014 | 3 | 2014 |
PENERAPAN SISTEM GMP (GOOD MANUFACTURING PRACTICE) DAN SPC (STATISTICAL PROCESS CONTROL) PADA PROSES PRODUKSI UNTUK MENINGKATKAN KUALITAS KERUPUK KETUMBAR (DI UKM KERUPUK BERKAH) S Ayu, A Merjani, Z Arifin PROFISIENSI: Jurnal Program Studi Teknik Industri 7 (1), 46-54, 2019 | 2 | 2019 |
Learning Material Analysis of Motorcycle Engine Tune-Up Practice Competency of Vocational High School Students S Hartanto, ZA Handoko, A Huda, R Fordiana, N Yeni International Journal of Recent Technology and Engineering (IJRTE). ISSN …, 2019 | 2 | 2019 |
PENJADWALAN PRODUKSI SPEAKER DENGAN PENDEKATAN HEURISTIC DISPATCHING RULE DI STATION DOUBLE RE UNTUK MENGOPTIMALKAN WAKTU ALIR RATA-RATA di PT. ABC Z Zulkifli, Z Arifin PROFISIENSI: Jurnal Program Studi Teknik Industri 9 (2), 262-270, 2021 | 1 | 2021 |
PERANCANGAN ALAT PEMISAH MINYAK GORENG UNTUK MENINGKATKAN KUALITAS KERIPIK SINGKONG DENGAN METODE QFD DI UKM NAFISAH VM Afma, Z Arifin SIGMA TEKNIKA 3 (2), 132-138, 2020 | 1 | 2020 |
Motor Cycle Tune-Up Learning Material Based on Industrial Competency for Vocational High School H Handoko, Z Arifin, A Huda, R Fordiana, N Yeni Asia Proceedings of Social Sciences 2 (4), 38-42, 2018 | 1 | 2018 |
Pengendalian Reject Chip Chasing Di Ic Pada Proses Trim and Form Dengan Pendekatan Doe (Study Kasus Di PT. Infineon Technologies Batam) Control of Reject Chip Chasing in Ic … L Oppusunggu, Z Arifin, A Merjani PROFISIENSI: Jurnal Program Studi Teknik Industri 4 (2), 2016 | 1 | 2016 |
IMPLEMENTATION OF CSR PT PLN (PERSERO) UIP JBTB II IN EMPOWERING THE BATIK WISTARA DISABILITY GROUP Z Arifin, AM Huda The Commercium 8 (01), 183-195, 2024 | | 2024 |
Analysis of Learning Material on 4-Stroke Engine Tune-Up Practice of Motorcycle Engineering S Hartanto, Z Arifin KnE Social Sciences, 25–35-25–35, 2019 | | 2019 |
Perencanaan Kebutuhan Luas Lahan pada Tata Letak Fasilitas Area Pelayanan Proses di Alya Jaya Motor RE Putri, H Irwan, Z Arifin PROFISIENSI: Jurnal Program Studi Teknik Industri 2 (1), 2014 | | 2014 |
Efisiensi Pemakaian Air Pada Proses Reverse Osmosis Dengan Menggunakan Rekayasa Nilai Di Pt. excelitas Technologies Batam I Imran, D Redantan, Z Arifin PROFISIENSI: Jurnal Program Studi Teknik Industri 2 (1), 2014 | | 2014 |
Mengurangi Keterlambatan Pada Proyek Pembuatan Cargo Barge 300'(studi Kasus Pt. sekar Permata Nusa) E Setioko, D Redantan, Z Arifin PROFISIENSI: Jurnal Program Studi Teknik Industri 1 (1), 2013 | | 2013 |