An efficient bi-objective algorithm to solve re-entrant hybrid flow shop scheduling with learning effect and setup times SM Mousavi, I Mahdavi, J Rezaeian, M Zandieh Operational Research 18, 123-158, 2018 | 38 | 2018 |
A simulated annealing/local search to minimize the makespan and total tardiness on a hybrid flowshop SM Mousavi, M Zandieh, M Yazdani The International Journal of Advanced Manufacturing Technology 64, 369-388, 2013 | 33 | 2013 |
An efficient bi-objective heuristic for scheduling of hybrid flow shops SM Mousavi, M Zandieh, M Amiri The International Journal of Advanced Manufacturing Technology 54, 287-307, 2011 | 21 | 2011 |
Bi-objective scheduling for the re-entrant hybrid flow shop with learning effect and setup times SM Mousavi, I Mahdavi, J Rezaeian, M Zandieh Scientia Iranica 25 (4), 2233-2253, 2018 | 16 | 2018 |
Bi-objective hybrid flow shop scheduling: a new local search SM Mousavi, M Mousakhani, M Zandieh The International Journal of Advanced Manufacturing Technology 64, 933-950, 2013 | 16 | 2013 |
An efficient hybrid algorithm for a bi-objectives hybrid flow shop scheduling SM Mousavi, M Zandieh Intelligent automation & soft computing, 1-8, 2016 | 14 | 2016 |
Comparisons of bi-objective genetic algorithms for hybrid flowshop scheduling with sequence-dependent setup times SM Mousavi, M Zandieh, M Amiri International Journal of Production Research 50 (10), 2570-2591, 2012 | 14 | 2012 |
Minimizing the Makespan and Total Tardiness in Hybrid Flow Shop Scheduling with Sequence-Dependent Setup Times SM Mousavi, P Shahnazari-Shahrezaei Management and Production Engineering Review, 13-24-13-24, 2023 | 1 | 2023 |
AN EFFICIENT SIMULATED ANNEALING FOR A HYBRID FLOW SHOP SCHEDULING PROBLEM WITH SEQUENCE-DEPENDENT SETUP TIMES AND TWO OBJECTIVES SM Mousavi International Journal of Industrial Engineering: Theory, Applications and …, 2021 | 1 | 2021 |
A mathematical model of the location problem for central and secondary warehouses in the multi-level supply chain network of perishable products SM Mousavi, M Motamedi, R Karimi International Journal of Research in Industrial Engineering 13 (1), 11-24, 2024 | | 2024 |
Evaluation of Bi-objective Scheduling Problems by FDH, Distance and Triangle Methods SM Mousavi Journal of Advances in Computer Research 9 (2), 1-20, 2018 | | 2018 |
ارائه یک مدل تلفیقی از الگوریتم های شبیه سازی تبرید و الگوریتم ژنتیک برای بهینه سازی فرایند تولید خوراک دام امیری, مقصود, حاتمی, موسوی مطالعات مدیریت صنعتی 5 (14), 251-273, 2006 | | 2006 |
زمانبندی دو هدفه جریان کارگاهی مختلط با تقریب پارتو در یک منطقه مشخص سید مصطفی موسوی فصلنامه مدیریت صنعتی 12 (42), 1-14, 1396 | | 1396 |