Scheduling analysis of time-constrained dual-armed cluster tools JH Kim, TE Lee, HY Lee, DB Park IEEE Transactions on Semiconductor Manufacturing 16 (3), 521-534, 2003 | 302 | 2003 |
A three-level supply chain network design model with risk-pooling and lead times S Park, TE Lee, CS Sung Transportation Research Part E: Logistics and Transportation Review 46 (5 …, 2010 | 187 | 2010 |
Scheduling single-armed cluster tools with reentrant wafer flows HY Lee, TE Lee IEEE transactions on Semiconductor Manufacturing 19 (2), 226-240, 2006 | 171 | 2006 |
A review of scheduling theory and methods for semiconductor manufacturing cluster tools TE Lee 2008 Winter simulation conference, 2127-2135, 2008 | 166 | 2008 |
An extended event graph with negative places and tokens for time window constraints TE Lee, SH Park IEEE Transactions on Automation Science and Engineering 2 (4), 319-332, 2005 | 165 | 2005 |
Schedulability analysis of time-constrained cluster tools with bounded time variation by an extended Petri net JH Kim, TE Lee IEEE Transactions on Automation Science and Engineering 5 (3), 490-503, 2008 | 147 | 2008 |
Modelling and analysis of semiconductor manufacturing in a shrinking world: challenges and successes CF Chien, S Dauzère-Pérès, H Ehm, JW Fowler, Z Jiang, ... European Journal of Industrial Engineering 4 5 (3), 254-271, 2011 | 128 | 2011 |
An efficient mixed integer programming model based on timed Petri nets for diverse complex cluster tool scheduling problems C Jung, TE Lee IEEE Transactions on Semiconductor Manufacturing 25 (2), 186-199, 2011 | 121 | 2011 |
Workload balancing and scheduling of a single-armed cluster tool TE Lee, HY Lee, YH Shin APIEMS, 1-6, 2004 | 121 | 2004 |
Performance measures and schedules in periodic job shops TE Lee, ME Posner Operations Research 45 (1), 72-91, 1997 | 115 | 1997 |
Modeling and implementing a real-time scheduler for dual-armed cluster tools YH Shin, TE Lee, JH Kim, HY Lee Computers in Industry 45 (1), 13-27, 2001 | 112 | 2001 |
Scheduling cluster tools with ready time constraints for consecutive small lots HJ Kim, JH Lee, C Jung, TE Lee IEEE Transactions on Automation Science and Engineering 10 (1), 145-159, 2012 | 111 | 2012 |
Noncyclic scheduling of cluster tools with a branch and bound algorithm HJ Kim, JH Lee, TE Lee IEEE Transactions on Automation Science and Engineering 12 (2), 690-700, 2013 | 109 | 2013 |
Scheduling start-up and close-down periods of dual-armed cluster tools with wafer delay regulation TK Kim, C Jung, TE Lee International Journal of Production Research 50 (10), 2785-2795, 2012 | 83 | 2012 |
Petri net modeling and scheduling for cyclic job shops with blocking JS Song, TE Lee Computers & Industrial Engineering 34 (2), 281-295, 1998 | 79 | 1998 |
Scheduling cluster tools for concurrent processing of two wafer types JH Lee, HJ Kim, TE Lee IEEE Transactions on Automation Science and Engineering 11 (2), 525-536, 2014 | 71 | 2014 |
A branch and bound algorithm for cyclic scheduling of timed Petri nets C Jung, HJ Kim, TE Lee IEEE Transactions on Automation Science and Engineering 12 (1), 309-323, 2013 | 70 | 2013 |
Noncyclic scheduling for timed discrete-event systems with application to single-armed cluster tools using Pareto-optimal optimization U Wikborg, TE Lee IEEE Transactions on Automation Science and Engineering 10 (3), 699-710, 2012 | 68 | 2012 |
Component allocation and feeder arrangement for a dual-gantry multi-head surface mounting placement tool DS Sun, TE Lee, KH Kim International Journal of Production Economics 95 (2), 245-264, 2005 | 67 | 2005 |
Stable earliest starting schedules for cyclic job shops: a linear system approach TE Lee International Journal of Flexible Manufacturing Systems 12, 59-80, 2000 | 67 | 2000 |