Rubber-tire particles as concrete aggregate NN Eldin, AB Senouci Journal of materials in civil engineering 5 (4), 478-496, 1993 | 1206 | 1993 |
Measurement and prediction of the strength of rubberized concrete NN Eldin, AB Senouci Cement and Concrete Composites 16 (4), 287-298, 1994 | 257 | 1994 |
Use of genetic algorithms in resource scheduling of construction projects AB Senouci, NN Eldin Journal of construction engineering and management 130 (6), 869-877, 2004 | 244 | 2004 |
Time delay and cost overrun in Qatari public construction projects A Senouci, A Ismail, N Eldin Procedia engineering 164, 368-375, 2016 | 213 | 2016 |
Construction and performance of a shredded waste tire test embankment PJ Bosscher, TB Edil, NN Eldin Transportation Research Record, 1992 | 213 | 1992 |
Adaptive real-time tracking and simulation of heavy construction operations for look-ahead scheduling L Song, NN Eldin Automation in Construction 27, 32-39, 2012 | 150 | 2012 |
Observations on rubberized concrete behavior NN Eldin, AB Senouci Cement, Concrete, and Aggregates 15 (1), 74-84, 1993 | 134 | 1993 |
A COM-based spatial decision support system for industrial site selection K Eldrandaly, N Eldin, D Sui Journal of Geographic Information and Decision Analysis 7 (2), 72-92, 2003 | 125 | 2003 |
Use of scrap tires in road construction NN Eldin, AB Senouci Journal of Construction Engineering and Management 118 (3), 561-576, 1992 | 122 | 1992 |
Pilot study of quality function deployment in construction projects N Eldin, V Hikle Journal of construction engineering and management 129 (3), 314-329, 2003 | 94 | 2003 |
A pavement condition‐rating model using backpropagation neural networks NN Eldin, AB Senouci Computer‐Aided Civil and Infrastructure Engineering 10 (6), 433-441, 1995 | 75 | 1995 |
Integrating GIS and MCDM Using COM Technology. KA Eldrandaly, N Eldin, DZ Sui, MA Shouman, G Nawara Int. Arab J. Inf. Technol. 2 (2), 162-167, 2005 | 68 | 2005 |
Dynamic programming approach to scheduling of nonserial linear project AB Senouci, NN Eldin Journal of computing in civil engineering 10 (2), 106-114, 1996 | 67 | 1996 |
Measurement of work progress: Quantitative technique NN Eldin Journal of Construction Engineering and Management 115 (3), 462-474, 1989 | 66 | 1989 |
Management of engineering/design phase NN Eldin Journal of Construction Engineering and Management 117 (1), 163-175, 1991 | 64 | 1991 |
Engineering properties of rubberized concrete NN Eldin, AB Senouci Canadian journal of civil engineering 19 (5), 912-923, 1992 | 56 | 1992 |
Constructability improvement of project designs NN Eldin Journal of Construction Engineering and Management 114 (4), 631-640, 1988 | 54 | 1988 |
A promising planning tool: quality function deployment N Eldin Cost Engineering 44 (3), 28, 2002 | 50 | 2002 |
Analysis of change orders in Qatari construction projects A Senouci, A Alsarraj, M Gunduz, N Eldin International Journal of Construction Management 17 (4), 280-292, 2017 | 46 | 2017 |
Concurrent engineering: A schedule reduction tool NN Eldin Journal of Construction Engineering and Management 123 (3), 354-362, 1997 | 46 | 1997 |