Hybrid firefly-simulated annealing algorithm for the flow shop problem with learning effects and flexible maintenance activities B Vahedi Nouri, P Fattahi, R Ramezanian International Journal of Production Research 51 (12), 3501-3515, 2013 | 78 | 2013 |
A hybrid multi-objective genetic algorithm based on the ELECTRE method for a capacitated flexible job shop scheduling problem M Rohaninejad, A Kheirkhah, P Fattahi, B Vahedi-Nouri The International Journal of Advanced Manufacturing Technology 77, 51-66, 2015 | 66 | 2015 |
A multi-objective model for a nurse scheduling problem by emphasizing human factors M Hamid, R Tavakkoli-Moghaddam, F Golpaygani, B Vahedi-Nouri Proceedings of the institution of mechanical engineers, Part H: journal of …, 2020 | 58 | 2020 |
Minimizing total flow time for the non-permutation flow shop scheduling problem with learning effects and availability constraints B Vahedi-Nouri, P Fattahi, R Ramezanian Journal of Manufacturing Systems 32 (1), 167-173, 2013 | 53 | 2013 |
A general flow shop scheduling problem with consideration of position-based learning effect and multiple availability constraints B Vahedi-Nouri, P Fattahi, R Tavakkoli-Moghaddam, R Ramezanian The International Journal of Advanced Manufacturing Technology 73, 601-611, 2014 | 43 | 2014 |
Scheduling of human-robot collaboration in assembly of printed circuit boards: a constraint programming approach M Mokhtarzadeh, R Tavakkoli-Moghaddam, B Vahedi-Nouri, A Farsi International Journal of Computer Integrated Manufacturing 33 (5), 460-473, 2020 | 34 | 2020 |
A hybrid learning-based meta-heuristic algorithm for scheduling of an additive manufacturing system consisting of parallel SLM machines M Rohaninejad, R Tavakkoli-Moghaddam, B Vahedi-Nouri, Z Hanzálek, ... International Journal of Production Research 60 (20), 6205-6225, 2022 | 32 | 2022 |
A new weighted distance-based approximation methodology for flow shop scheduling group decisions under the interval-valued fuzzy processing time Y Dorfeshan, R Tavakkoli-Moghaddam, SM Mousavi, B Vahedi-Nouri Applied Soft Computing 91, 106248, 2020 | 31 | 2020 |
Two hybrid tabu search–firefly algorithms for the capacitated job shop scheduling problem with sequence-dependent setup cost M Rohaninejad, AS Kheirkhah, B Vahedi Nouri, P Fattahi International Journal of Computer Integrated Manufacturing 28 (5), 470-487, 2015 | 31 | 2015 |
Scheduling of multi-robot job shop systems in dynamic environments: mixed-integer linear programming and constraint programming approaches S Fatemi-Anaraki, R Tavakkoli-Moghaddam, M Foumani, B Vahedi-Nouri Omega 115, 102770, 2023 | 29 | 2023 |
Incorporating order acceptance, pricing and equity considerations in the scheduling of cloud manufacturing systems: matheuristic methods B Vahedi-Nouri, R Tavakkoli-Moghaddam, Z Hanzálek, H Arbabi, ... International Journal of Production Research 59 (7), 2009-2027, 2021 | 28 | 2021 |
Minimizing the total completion time on a single machine with the learning effect and multiple availability constraints B Vahedi-Nouri, P Fattahi, M Rohaninejad, R Tavakkoli-Moghaddam Applied Mathematical Modelling 37 (5), 3126-3137, 2013 | 28 | 2013 |
A New Approach to Cooperative Competition in Facility Location Problems: Mathematical Formulations and an Approximation Algorithm M Rohaninejad, H Navidi, B Vahedi Nouri, R Kamranrad Computers & Operations Research, 2017 | 26 | 2017 |
Multi-objective optimization of integrated lot-sizing and scheduling problem in flexible job shops M Rohaninejada, R Sahraeiana, B Vahedi Nouri RAIRO-Operations Research 50 (3), 587-609, 2016 | 26 | 2016 |
New products or remanufactured products: Which is consumer-friendly under a closed-loop multi-level supply chain? AA Taleizadeh, MS Moshtagh, B Vahedi-Nouri, B Sarkar Journal of Retailing and Consumer Services 73, 103295, 2023 | 24 | 2023 |
Simultaneous waterway scheduling, berth allocation, and quay crane assignment: A novel matheuristic approach S Fatemi-Anaraki, R Tavakkoli-Moghaddam, D Abdolhamidi, ... International Journal of Production Research 59 (24), 7576-7593, 2021 | 24 | 2021 |
Workforce planning and production scheduling in a reconfigurable manufacturing system facing the COVID-19 pandemic B Vahedi-Nouri, R Tavakkoli-Moghaddam, Z Hanzálek, A Dolgui Journal of Manufacturing Systems 63, 563-574, 2022 | 21 | 2022 |
Bi-objective collaborative electric vehicle routing problem: Mathematical modeling and matheuristic approach B Vahedi-Nouri, H Arbabi, F Jolai, R Tavakkoli-Moghaddam, ... Journal of Ambient Intelligence and Humanized Computing 14 (8), 10277-10297, 2023 | 16 | 2023 |
A multi-objective scheduling model for a cloud manufacturing system with pricing, equity, and order rejection B Vahedi-Nouri, R Tavakkoli-Moghaddam, M Rohaninejad IFAC-PapersOnLine 52 (13), 2177-2182, 2019 | 15 | 2019 |
Production scheduling in a reconfigurable manufacturing system benefiting from human-robot collaboration B Vahedi-Nouri, R Tavakkoli-Moghaddam, Z Hanzálek, A Dolgui International Journal of Production Research 62 (3), 767-783, 2024 | 11 | 2024 |