关注
Jesús Vázquez Hernández
Jesús Vázquez Hernández
Tecnológico de Monterrey
在 tec.mx 的电子邮件经过验证 - 首页
标题
引用次数
引用次数
年份
Increasing service quality at a university: a continuous improvement project
F Gonzalez Aleu, EMA Granda Gutierrez, JA Garza-Reyes, ...
Quality Assurance in Education 29 (2/3), 209-224, 2021
112021
Strategic planning for repurposing kitchen equipment production operations during COVID-19 pandemic
F González-Aleu, JV Hernandez, R Ramirez, CM Linares, JA Peinado, ...
Operations Management Research 15 (3), 1241-1256, 2022
72022
Application of industry 4.0, digital transformation, and lean six sigma to detect cold weld defects
J Vazquez-Hernandez, R Martínez-García, F González-Aleu, ...
Lean Six Sigma 4.0 for Operational Excellence Under the Industry 4.0 …, 2023
32023
Increasing forklift time utilization in a food equipment manufacturing plant with a Kaizen event
F Gonzalez-Aleu, D Garza-Gutierrez, EMA Granda-Gutierrez, ...
International Scientific-Technical Conference MANUFACTURING, 182-193, 2022
32022
Lean manufacturing maturity model for an automotive cluster: A case study in Mexico
HD Colín-Lozano, S Guerra-Loji, MA Vargas-Alvarado, ...
Proceedings of the International Conference on Industrial Engineering and …, 2019
32019
Reduce slow moving inventory of convenience stores: A case study
B Villarreal, L Sosa, J Vazquez, E Quintanilla, M Herrera, D Villarreal
management, 2018
32018
Lean manufacturing maturity model for an automotive cluster: A case study in Mexico
HD Coli, S Guerra-Loji, MA Vargas-Alvarado, LM Valdez-de la Rosa, ...
4th North American IEOM Conference. IEOM 2019, 377-390, 2019
22019
Industry 4.0: Success through Collaboration
F Gonzalez-Aleu, C Robertson, J Vazquez, T Verduzco-Garza, ...
Emerging Frontiers in Industrial and Systems Engineering, 21-34, 2019
22019
Line balancing in assembly line. A case study
MES Barrientos, VA Hinojosa, FMA García, T Verduzco-Garza, ...
Proceedings of the International Conference on Industrial Engineering and …, 2018
12018
A continuous improvement project to increase the fulfillment level in a wire and cable company
MEC Hidalgo, YAS Muñiz, AJC De León, FG Aleu, J Vazquez, ...
Proceedings of the International Conference on Industrial Engineering and …, 2017
12017
Improving spare parts (MRO) inventory management policies after COVID-19 pandemic: a Lean Six Sigma 4.0 project
J Vazquez Hernandez, MD Elizondo Rojas
The TQM Journal 36 (6), 1627-1650, 2024
2024
Increasing Forklift Time Utilization in a Food Equipment Manufacturing Plant with a Kaizen Event
EMA Granda-Gutierrez, J Vazquez-Hernandez
Advances in Manufacturing III: Volume 3-Quality Engineering: Research and …, 2022
2022
Prospectiva 4.0: De la Planeación Estratégica a la Inteligencia de Negocios
JV Hernández
2020
Increasing Value Added in an automotive assembly line. A case study.
MES Barrientos, VA Hinojosa, FMA García, T Verduzco-Garza, J Vázquez, ...
2018
Incremento en la productividad para una línea de gomas confitadas en una fábrica de dulces
R Trujillo Vargas, J Vazquez Hernández
San Pedro Garza García: UDEM, 2002
2002
A Logistic Regression Model to Predict the Induction of Professional Baseball Players into the Hall of Fame
JAB Ferreiro, DC Soto, SJ Garza, DAG Bustos, F González-Aleu, ...
系统目前无法执行此操作,请稍后再试。
文章 1–16