What are the causes and cures of poor megaproject performance? A systematic literature review and research agenda J Denicol, A Davies, I Krystallis Project management journal 51 (3), 328-345, 2020 | 237 | 2020 |
Digital Technologies in Built Environment Projects: Review and Future Directions E Papadonikolaki, I Krystallis, B Morgan Project Management Journal, 87569728211070225, 2022 | 49 | 2022 |
Digital transformation in construction-Systematic literature review of evolving concepts E Papadonikolaki, I Krystallis, B Morgan Engineering Project Organization Society (EPOS), 2020 | 19 | 2020 |
Using BIM to integrate and achieve holistic future-proofing objectives in healthcare projects I Krystallis, P Demian, ADF Price Construction management and economics 33 (11-12), 890-906, 2015 | 17 | 2015 |
Are megaprojects ready for the Fourth Industrial Revolution? D Whitmore, E Papadonikolaki, I Krystallis, G Locatelli Proceedings of the Institution of Civil Engineers-Management, Procurement …, 2020 | 16 | 2020 |
Talking about futureproofing: Real options reasoning in complex infrastructure projects I Krystallis, G Locatelli, N Murtagh IEEE transactions on engineering management 69 (6), 3009-3022, 2020 | 15 | 2020 |
Rationales and practices for dynamic stakeholder engagement and disengagement. Evidence from dementia-friendly health and social care environments F Pascale, E Pantzartzis, I Krystallis, ADF Price Construction management and economics 38 (7), 623-639, 2020 | 9 | 2020 |
Future-proofing governance and BIM for owner operators in the UK I Krystallis, V Vernikos, S El-Jouzi, P Burchill Infrastructure Asset Management 3 (1), 12-20, 2016 | 9 | 2016 |
Design of flexible and adaptable healthcare buildings of the future: a BIM approach I Krystallis, P Demian, ADF Price BIM Academy, Northumbria University, 2012 | 9 | 2012 |
Cybernetics in Project Management: a conceptual framework to analyze and enhance the performance of alliances via the application of Viable System Model M Tannir, G Mills, I Krystallis Proceedings of the British Academy of Management, 2019 | 5 | 2019 |
Towards a Methodology for Quantifying the Benefits of BIM I Krystallis, E Papadonikolaki, G Locatelli, O Iuorio EC3 Conference 2019 1, 19-24, 2019 | 5 | 2019 |
Futureproofing Complex Infrastructure Projects Using Real Options I Krystallis, G Locatelli, N Murtagh IEEE Engineering Management Review 49 (1), 127-132, 2021 | 4 | 2021 |
A study of the concept of future-proofing in healthcare building asset management and the role of BIM in its delivery I Krystallis Loughborough University, 2016 | 4 | 2016 |
Supporting future-proof healthcare design by narrowing the design space of solutions using building information modelling I Krystallis, P Demian, A Price Association of Researchers in Construction Management (ARCOM), 2013 | 4 | 2013 |
Governance, cooperation and coordination in large inter-organisational project networks: a viable system perspective M Tannir, G Mills, I Krystallis, J Kalra International Journal of Operations & Production Management 44 (3), 617-642, 2024 | 3 | 2024 |
A sustainable built environment for healthcare: generative mechanisms for future-proofing I Krystallis, B Rickaby, N Murtagh OP Conf. Ser.: Earth Environ. Sci. 297, 1-9, 2019 | 3 | 2019 |
Normalizing white-collar wrongdoing in professional service firms I Krystallis, G Locatelli Journal of Management in Engineering 38 (5), 04022049, 2022 | 2 | 2022 |
Managing Uncertainty (opportunities and threats) in Megaprojects B Rickaby, I Krystallis, A Davies International Research Network on Organizing by Projects (IRNOP), 2018 | 2 | 2018 |
Using Building Information Modelling (BIM) to design flexible spaces with design standards in healthcare facilities AM Ahmad, I Krystallis, P Demian, A Price Loughborough University, 2014 | 2 | 2014 |
Captain and conscript or companions in operational reconfiguration? The case of an infrastructure owner with projects and asset management units I Krystallis, G Locatelli, E Papadonikolaki Production Planning & Control, 1-18, 2023 | 1 | 2023 |