关注
Alemu Moges Belay
Alemu Moges Belay
在 ntnu.no 的电子邮件经过验证
标题
引用次数
引用次数
年份
Design for manufacturability and concurrent engineering for product development
AM Belay
International Journal of Industrial and Manufacturing Engineering 3 (1), 1-7, 2009
602009
Lean Construction Practices and its Effects: A Case Study at St Olav’s Integrated Hospital, Norway
B Andersen, AM Belay, EA Seim
Lean costruction Journal 1 (1), 122-149, 2012
562012
Effects of quality management practices and concurrent engineering in business performance
AM Belay, P Helo, J Takala, FM Kasie
Canadian Center of Science and Education (CCSE), 2011
562011
Cost development over-time at construction planning phase: Empirical evidence from Norwegian construction projects
O Torp, AM Belay, C Thodesen, OJ Klakegg
Procedia Engineering 145, 1177-1184, 2016
502016
Cost estimation methods for transport infrastructure: a systematic literature review
M Barakchi, O Torp, AM Belay
Procedia engineering 196, 270-277, 2017
492017
Adoption of quality management practices: An investigation of its relationship with labor productivity for labor-intensive manufacturing companies
AM Belay, FM Kasie, P Helo, J Takala, DJ Powell
Benchmarking: An International Journal 21 (1), 77-100, 2014
492014
The impact of multi-criteria performance measurement on business performance improvement
FM Kasie, AM Belay
Journal of Industrial Engineering and Management 6 (2), 595-625, 2013
392013
Managing concurrent construction projects using knowledge management and set-based thinking
AM Belay, O Torp, C Thodesen
Procedia engineering 164, 235-242, 2016
242016
Approaching lean product development using system dynamics: investigating front-load effects
AM Belay, T Welo, P Helo
Advances in Manufacturing 2, 130-140, 2014
232014
Do longer projects have larger cost deviation than shorter construction projects?
AM Belay, O Torp
Procedia engineering 196, 262-269, 2017
212017
A framework for organizing a resilient cost benefit analysis for construction projects
AM Belay, O Torp, C Thodesen, J Odeck
Procedia Engineering 145, 1169-1176, 2016
162016
Time-to-market and concurrent engineering in product development processes
AM Belay, T Kekäle, P Helo
International journal of innovation and learning 10 (1), 60-84, 2011
132011
Considering BPR and CE for faster product delivery: a case study in manufacturing firms
AM Belay, P Helo, J Takala, T Welo
International Journal of Productivity and Quality Management 13 (3), 349-375, 2014
82014
System of systems thinking in product development: A system dynamic approach
AM Belay, P Helo, T Welo
2012 7th International Conference on System of Systems Engineering (SoSE …, 2012
62012
Modeling Concurrent Engineering to Improve Product Development Performance
AM Belay
PHD Thesis in Science in Mechanical Engineering, University of Vaasa, Finland, 2013
52013
Concurrent engineering yesterday, today and tomorrow
AM Belay, P Helo, FM Kasie
Improving Complex Systems Today: Proceedings of the 18th ISPE International …, 2011
52011
Scaled critical factor index for optimal resource allocation in service and lean construction
AM Belay, J Takala, R Toshev, B Andersen
International Journal of Sustainable Economy 5 (3), 286-306, 2013
42013
Developing Novel Technologies and Services for Intelligent Low Voltage Electricity Grids: Cost–Benefit Analysis and Policy Implications
AM Belay, S Puranik, R Gallart-Fernández, H Tuiskula, J Melendez, ...
Energies 15 (1), 94, 2021
32021
Construction cost performance under quality-gated framework: the cases of Norwegian road constructions
AM Belay, O Torp
International Journal of Construction Management 23 (6), 1030-1043, 2023
22023
Modeling concurrent engineering to improve product development performance: a system dynamic approach
AM Belay
Vaasan yliopisto, 2013
12013
系统目前无法执行此操作,请稍后再试。
文章 1–20