Contractual perspective for BIM utilization in US construction projects R Assaad, IH El-Adaway, AH El Hakea, MJ Parker, TI Henderson, ... Journal of construction engineering and management 146 (12), 04020128, 2020 | 58 | 2020 |
Recent computer vision applications for pavement distress and condition assessment AH El Hakea, MW Fakhr Automation in Construction 146, 104664, 2023 | 24 | 2023 |
Using the simplified acquisition of base engineer requirements in construction projects: Contract administration guidelines D Sexton, IH El-adaway, M Abdul Nabi, AH El Hakea Journal of legal affairs and dispute resolution in engineering and …, 2020 | 13 | 2020 |
Optimum planning for multi-project earthmoving operations S Abu-Samra, AH El Hakea, C Khalil, O Hosny, A Elhakeem ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2013 | 7 | 2013 |
Integrated simulation model for maintenance and repair optimization for rubble mound coastal structures using Markov chains, regression and genetic algorithms AH El Hakea, S Abu-Samra, O Hosny, M Iskander, H Osman nternational Association for Automation & Robotics in Construction (IAARC), 2015 | 4 | 2015 |
Structural deterioration prediction modeling for Alexandria city coastal structures using Markov Chains and Artificial Neural Networks A El Hakea, S Abu-Samra, O Hosny, H Osman Proceedings of the Construction Research Congress 2014, 2014 | 4 | 2014 |
Modeling of Structural Deterioration of Rubble Mound Marine Revetments Using Fuzzy Logic and Considering a Single Structural Inspection Point AH El Hakea, AM Alhady, O Hosny, H Osman, M Iskander International Conference on Computing in Construction and Building …, 2016 | 2 | 2016 |
Integrated life-cycle cost & risk optimization framework for coastal protection structures E Hakea, AH Abdel-Wahab | 2 | 2015 |
Structural deterioration prediction modeling for coastal protection structures in Alexandria Eastern Harbor A El Hakea, S Abu-Samra, O Hosny, H Osman Construction Research Congress 2014: Construction in a Global Network, 2185-2194, 2014 | 2 | 2014 |
Life-cycle cost simulation and optimization modeling for coastal structures using Markov Chains and Genetic Algorithms H Ayman, S Abu-Samra 2015 International Conference on Industrial Engineering and Operations …, 2015 | 1 | 2015 |
Risk-Based Self-Improving Asset Management Framework for Coastal Protection Structures Using 1+ Inspection Points H Ayman, M Sami, A Badawy, E Elbeltagi, O Hosny, M Iskander, ... ASCE, 2024 | | 2024 |
Risk-Based Self-Improving Asset Management Framework for Coastal Protection Structures Using 1+ Inspection Points AH El Hakea, M Sami, A Badawy, E Elbeltagi, O Hosny, M Iskander, ... Journal of Performance of Constructed Facilities 38 (3), 04024007, 2024 | | 2024 |
Optimum daylighting and thermal comfort simulation framework for school buildings in hot arid climate M Adel Ahmed Mahmoud, M Dorra, K Nassar, A Hassan El Hakea, ... Building Simulation 2021 17, 2929-2937, 2021 | | 2021 |
SUSTAINABLE DESIGN OPTIMIZATION TOOL FOR PROTOTYPICAL BUILDINGS IN HOT ARID CLIMATE USING ANALYTICAL HIERARCHY PROCESS MA Mahmoud, M Dorra, K Nassar, AH El Hakeaand, H Nadim Journal of Al-Azhar University Engineering Sector 16 (60), 814-832, 2021 | | 2021 |
Optimum Daylighting and Thermal Comfort Simulation Framework for School Buildings in Hot Arid Climate MAA Mahmoud, M Dorra, K Nassar, AH El Hakea, M Shaltot Proceedings of the Building Simulation 2021 Conference (BS2021), Bruges, Belgium, 2021 | | 2021 |
Construction Insurance Machine-Learning Estimation Approach for Multiple Attempted Bids AH El Hakea, MS Eid Construction Research Congress 2022, 274-282, 0 | | |