Risk identification and assessment for build–operate–transfer projects: A fuzzy multi attribute decision making model S Ebrahimnejad, SM Mousavi, H Seyrafianpour Expert systems with Applications 37 (1), 575-586, 2010 | 268 | 2010 |
A novel two-phase group decision making approach for construction project selection in a fuzzy environment S Ebrahimnejad, SM Mousavi, R Tavakkoli-Moghaddam, H Hashemi, ... Applied Mathematical Modelling 36 (9), 4197-4217, 2012 | 207 | 2012 |
Emperor Penguins Colony: a new metaheuristic algorithm for optimization S Harifi, M Khalilian, J Mohammadzadeh, S Ebrahimnejad Evolutionary intelligence 12, 211-226, 2019 | 172 | 2019 |
Multi-criteria decision making for plant location selection: an integrated Delphi–AHP–PROMETHEE methodology SM Mousavi, R Tavakkoli-Moghaddam, M Heydar, S Ebrahimnejad Arabian Journal for Science and Engineering 38, 1255-1268, 2013 | 132 | 2013 |
Giza Pyramids Construction: an ancient-inspired metaheuristic algorithm for optimization S Harifi, J Mohammadzadeh, M Khalilian, S Ebrahimnejad Evolutionary Intelligence 14 (4), 1743-1761, 2021 | 107 | 2021 |
Soft computing-based preference selection index method for human resource management B Vahdani, SM Mousavi, S Ebrahimnejad Journal of Intelligent & Fuzzy Systems 26 (1), 393-403, 2014 | 87 | 2014 |
Two meta-heuristics for three-stage assembly flowshop scheduling with sequence-dependent setup times YM Sara Hatami, Sadoullah Ebrahimnejad,Reza Tavakkoli-Moghaddam springer 50 (9), 1153-1164, 2010 | 81* | 2010 |
A bi-objective model of preventive maintenance planning in distributed systems considering vehicle routing problem M Rashidnejad, S Ebrahimnejad, J Safari Computers & Industrial Engineering 120, 360-381, 2018 | 76 | 2018 |
A novel hybrid MCDM approach for outsourcing supplier selection: A case study in pipe and fittings manufacturing M Rezaeisaray, S Ebrahimnejad, K Khalili-Damghani Journal of Modelling in Management 11 (2), 536-559, 2016 | 69 | 2016 |
An improved hybrid grey relational analysis approach for green resilient supply chain network assessment A Malek, S Ebrahimnejad, R Tavakkoli-Moghaddam Sustainability 9 (8), 1433, 2017 | 62 | 2017 |
A multi-stage decision-making process for multiple attributes analysis under an interval-valued fuzzy environment SM Mousavi, B Vahdani, R Tavakkoli-Moghaddam, S Ebrahimnejad, ... The International Journal of Advanced Manufacturing Technology 64, 1263-1273, 2013 | 52 | 2013 |
Scheduling of elective patients considering upstream and downstream units and emergency demand using robust optimization A Moosavi, S Ebrahimnejad Computers & Industrial Engineering 120, 216-233, 2018 | 46 | 2018 |
Incorporating location, routing, and inventory decisions in a bi-objective supply chain design problem with risk-pooling R Tavakkoli-Moghaddam, F Forouzanfar, S Ebrahimnejad Journal of Industrial Engineering International 9, 1-6, 2013 | 42 | 2013 |
Risk ranking in mega projects by fuzzy compromise approach: A comparative analysis S Ebrahimnejad, SM Mousavi, R Tavakkoli-Moghaddam, M Heydar Journal of Intelligent & Fuzzy Systems 26 (2), 949-959, 2014 | 41 | 2014 |
Optimizing a neuro-fuzzy system based on nature-inspired emperor penguins colony optimization algorithm S Harifi, M Khalilian, J Mohammadzadeh, S Ebrahimnejad IEEE Transactions on Fuzzy Systems 28 (6), 1110-1124, 2020 | 40 | 2020 |
Optimization in solving inventory control problem using nature inspired Emperor Penguins Colony algorithm S Harifi, M Khalilian, J Mohammadzadeh, S Ebrahimnejad Journal of Intelligent Manufacturing 32, 1361-1375, 2021 | 38 | 2021 |
A green vehicle routing problem with time windows considering the heterogeneous fleet of vehicles: two metaheuristic algorithms N Rezaei, S Ebrahimnejad, A Moosavi, A Nikfarjam European journal of industrial engineering 13 (4), 507-535, 2019 | 37 | 2019 |
Evaluating high risks in large-scale projects using an extended VIKOR method under a fuzzy environment S Ebrahimnejad, S Mousavi, R Tavakkoli-Moghaddam, M Heydar International journal of industrial engineering computations 3 (3), 463-476, 2012 | 35 | 2012 |
Fuzzy bi-objective formulation for a parallel machine scheduling problem with machine eligibility restrictions and sequence-dependent setup times M Naderi-Beni, E Ghobadian, S Ebrahimnejad, R Tavakkoli-Moghaddam International Journal of Production Research 52 (19), 5799-5822, 2014 | 33 | 2014 |
A fuzzy decision-making model for risk ranking with an application to an onshore gas refinery S Ebrahimnejad, SM Mousavi, SMH Mojtahedi International Journal of Business Continuity and Risk Management 1 (1), 38-66, 2009 | 33 | 2009 |