关注
Arash Apornak
Arash Apornak
PhD, Department of industrial engineering, Tehran , Iran
在 ut.ac.ir 的电子邮件经过验证
标题
引用次数
引用次数
年份
Customer satisfaction measurement using SERVQUAL model, integration Kano and QFD approach in an educational institution
A Apornak
International Journal of Productivity and Quality Management 21 (1), 129-141, 2017
532017
Human resources optimization in hospital emergency using the genetic algorithm approach
A Apornak, S Raissi, A Keramati, K Khalili-Damghani
International Journal of Healthcare Management 14 (4), 1441-1448, 2021
422021
Optimizing human resource cost of an emergency hospital using multi-objective Bat algorithm
A Apornak, S Raissi, A Keramati, K Khalili-Damghani
International Journal of Healthcare Management 14 (3), 873-879, 2021
352021
Human resources allocation in the hospital emergency department during COVID-19 pandemic
A Apornak
International Journal of Healthcare Management 14 (1), 264-270, 2021
322021
Extension of the model of manufacturing supply chain quality management: an empirical study
A Apornak, MA Hezaveh
International journal of productivity and quality management 28 (4), 417-437, 2019
242019
Modeling multi-state system reliability analysis in a power station under fatal and nonfatal shocks: a simulation approach
MR Pourhassan, S Raissi, A Apornak
International journal of quality & reliability management 38 (10), 2080-2094, 2021
232021
The effect of service recovery on customers' satisfaction in e-banking: an empirical investigation
A Keramati, A Apornak, H Abedi, F Otrodi, M Roudneshin
International journal of business information systems 29 (4), 459-484, 2018
182018
Supplier selection model using QFD-ANP methodology under fuzzy multi-criteria environment
N Ahmadizadeh-Tourzani, A Keramati, A Apornak
International journal of productivity and quality management 24 (1), 59-83, 2018
182018
The influence of strategic decisions for provision of product (service) on the customer's priorities: case study of automotive industry
A Apornak
International Journal of Management Concepts and Philosophy 12 (4), 422-432, 2019
132019
Solving flexible flow-shop problem using a hybrid multi criteria Taguchi based computer simulation model and DEA approach
A Apornak, S Raissi, MR Pourhassan
Journal of industrial and systems engineering 13 (2), 264-276, 2021
122021
Key performance indicators of HSE in the hospital management system during corona virus pandemic
SF Mousavi, A Apornak, MR Pourhassan, S Raissi
Journal of Industrial and Systems Engineering 14 (1), 279-291, 2021
102021
A simulation-based multi-objective optimisation approach in flexible manufacturing system planning
A Apornak, S Raissi, M Javadi, N Ahmadizadeh-Tourzani, A Kazem
International Journal of Industrial and Systems Engineering 29 (4), 494-506, 2018
102018
The impact of pricing, lead time and capacity policies in a two-echelon supply chain
A Apornak
International Journal of Logistics Systems and Management 31 (1), 69-81, 2018
72018
Provide a framework to determine the key success factors of knowledge management based on ABC analysis: an empirical study in Iranian organisations
A Apornak, A Keramati
International Journal of Management Concepts and Philosophy 10 (3), 282-300, 2017
72017
Robust optimization model to improve supply chain network‎ productivity under uncertainty
SF Mousavi, A Apornak, M Pourhassan
Journal of applied research on industrial engineering 10 (2), 273-285, 2023
62023
Pricing and cooperative advertising decisions in a two-echelon dual-channel supply chain
A Apornak, A Keramati
International Journal of Operational Research 39 (3), 306-324, 2020
52020
Resource allocation problems in data envelopment analysis with‎ simultaneous shared costs and common revenue
K Khalili-Damghani, F Noorzadeh, A Apornak
International Journal of Data Envelopment Analysis 10 (2), 2022
42022
A simulation modelling approach to improve waiting time for outpatients of hospital emergency department
A Apornak, S Raissi, A Keramati, K Khalili-Damghani
International journal of knowledge management in tourism and hospitality 2 …, 2019
42019
Presenting a mathematical model for reduction of delays in construction projects considering quality management criteria in uncertainty conditions
J Sun, A Apornak, G Ma
Journal of Engineering Research 12 (3), 476-483, 2024
32024
Modelling new service development using Kano, QFD and mathematical programming in an emergency department healthcare unit
A Apornak, S Raissi, A Keramati, K Khalili-Damghani
International Journal of Process Management and Benchmarking 13 (1), 1-18, 2023
22023
系统目前无法执行此操作,请稍后再试。
文章 1–20