关注
Behzad Ashtiani
Behzad Ashtiani
Science and Research Branch, Islamic Azad University
在 iust.ac.ir 的电子邮件经过验证
标题
引用次数
引用次数
年份
Extension of fuzzy TOPSIS method based on interval-valued fuzzy sets
B Ashtiani, F Haghighirad, A Makui, G ali Montazer
Applied Soft Computing 9 (2), 457-461, 2009
5202009
A novel approach to determine cell formation, intracellular machine layout and cell layout in the CMS problem based on TOPSIS method
A Ahi, MB Aryanezhad, B Ashtiani, A Makui
Computers & Operations Research 36 (5), 1478-1496, 2009
1582009
New competitive results for the stochastic resource-constrained project scheduling problem: Exploring the benefits of pre-processing
B Ashtiani, R Leus, MB Aryanezhad
Journal of Scheduling 14, 157-171, 2011
1422011
A new approach for buffer sizing in critical chain scheduling
B Ashtiani, GR Jalali, MB Aryanezhad, A Makui
2007 IEEE International conference on industrial engineering and engineering …, 2007
632007
Critical chain project scheduling: Utilizing uncertainty for buffer sizing
M Fallah, B Ashtiani, MB Aryanezhad
International Journal of Research and Reviews in Applied Sciences 3 (3), 280-289, 2010
482010
Multi-start simulated annealing for dynamic plant layout problem
B Ashtiani, MB Arianezhad, MB FARHANG
JOURNAL OF INDUSTRIAL ENGINEERING INTERNATIONAL 3 (4), 44-50, 2007
182007
Preemptive resource constrained project scheduling problem with uncertain resource availabilities: Investigate worth of proactive strategies
M Fallah, MB Aryanezhad, B Ashtiani
2010 IEEE International Conference on Industrial Engineering and Engineering …, 2010
62010
ali Montazer G
B Ashtiani, F Haghighirad, A Makui
Extension of fuzzy TOPSIS method based on interval-valued fuzzy sets …, 2009
62009
A novel class of scheduling policies for the stochastic resource-constrained project scheduling problem
B Ashtiani, R Leus, MB Aryanezhad
Available at SSRN 1368714, 2008
52008
Mir. B. Aryanezhad, Behzad Ashtiani and Ahmad Makui,“A novel approach to determine cell formation, intracellular machine layout and cell layout in the CMS problem based on …
A Ahi
Computers & Operations Research 36 (5), 1478-1496, 2009
42009
Chaos in production planning
F Haghighirad, A Makui, B Ashtiani
Journal of Applied Mathematic and Informatics 26 (3-4), 739-750, 2008
32008
Qualitative Evaluation and Selecting the Optimum Public Private Partnership System for Transportation
B Farhang Moghaddam, AA Fatahi
International Journal of Research in Industrial Engineering 2 (2), 61-69, 2013
22013
Time-cost-resource optimization of resource constrained project scheduling problem with discounted cash flows using multi-objective gravitational search algorithm
F Paidar, B Ashtiani, R Tavakkoli Moghaddam
Int. J. Ind. Eng. Prod. Manag 28, 1-14, 2017
12017
Production planning under variable buffer size
M Fallah, B Ashtiani, M ARYANEZHAD, A AFSHARI
Kuwait Journal of Science and Engineering 38 (1), 211-226, 2011
12011
An investigation on the multiple attribute decision making (MADM) methods for solving the cell formation problem
A Ahi, B Ashtiani, MB Aryanezhad, A Makui
2007 IEEE International Conference on Industrial Engineering and Engineering …, 2007
12007
A HEURISTIC METHOD FOR SOLVING CELL FORMATION PROBLEM BASED ON P-MEDIAN MODEL
B ASHTIANI, H HOSSEINIAN, M RANJBAR, MIRB ARYANEZHAD
2008
journal homepage: www. elsevier. com/locate/asoc
A Abraham, V Achim, H Ahn, S Aine, CH Aladag, M Albakoor, L Ali, ...
شیک هاگشناد
B Ashtiani, H Hosseinian, M Ranjbar, MB Aryanezhad
系统目前无法执行此操作,请稍后再试。
文章 1–18