关注
Milad Saghebfar
Milad Saghebfar
Kiewit
在 kiewit.com 的电子邮件经过验证 - 首页
标题
引用次数
引用次数
年份
Performance monitoring of geosynthetic reinforced soil integrated bridge system (GRS-IBS) in Louisiana
M Saghebfar, M Abu-Farsakh, A Ardah, Q Chen, BA Fernandez
Geotextiles and Geomembranes 45 (2), 34-47, 2017
892017
Performance of geotextile-reinforced bases for paved roads
M Saghebfar
Kansas State University, 2016
392016
Full-scale testing of geosynthetic-reinforced, soil-integrated bridge system
M Saghebfar, MY Abu-Farsakh, A Ardah, Q Chen, BA Fernandez
Transportation Research Record 2656 (1), 40-52, 2017
282017
A Case Study on Evaluating the Performance of a Geosynthetic Reinforced Soil Integrated Bridge System (GRS-IBS)
M Abu-Farsakh, M Saghebfar, A Ardah, Q Chen
Geotechnical Frontiers, 12-22, 2017
142017
Accelerated load testing of geosynthetic base reinforced/stabilized unpaved and pavement test sections
MY Abu-Farsakh, Q Chen, S Hanandeh
Louisiana. Department of Transportation and Development, 2019
12*2019
Full-Scale Accelerated Load Testing of Geosynthetics Reinforced/Stabilized Paved Roads built over Native Soft Subgrade
S Hanandeh, M Abu-Farsakh, L Mohammad, Q Chen, M Saghebfar
62015
Evaluation of Interface Bond Strength of Asphalt Pavements
M Saghebfar, YM Najjar
Transportation Research Board 93rd Annual MeetingTransportation Research Board, 2014
42014
Investigation of Bearing Capacity of Geotextile-Reinforced Paved Roads
M Saghebfar, H Mustaque, BA Lacina, B Odgers
Mid-Continent Transportation Research Symposium, 2013
42013
Quantifying the Benefits of Geosynthetics Reinforcement in Flexible Pavement Design Using Cyclic Plate Load Testing
MY Abu-Farsakh, Q Chen, S Hanandeh, M Saghebfar
Transportation Research Record 2676 (8), 670-682, 2022
32022
Instrumentation Experience at the Kansas Accelerated Pavement Testing
M Saghefar, E Frink, B Bortz, M Hossain
Airfield and Highway Pavement, 1409-1423, 2013
3*2013
Monitoring of In-Service Geosynthetic Reinforced Soil (GRS) Bridge Abutments in Louisiana
M Abu-Farsakh, A Ardah, M Saghebfar
Louisiana. Department of Transportation and Development, 2020
22020
Monitoring the performance of Louisiana's first GRS-IBS bridge
M Abu-Farsakh, M Saghebfar, A Ardah, Q Chen
Geosynthetics 36 (3), 2018
22018
Instrumentation and Short-Term Performance Monitoring of Geosynthetic Reinforced Soil Integrated Bridge System
M Saghebfar, Milad: Abu-Farsakh, A Ardah
Transportation Research Board 95rd Annual Meeting, 2016
2016
Effect of Geotextilereinforced Base on Fatigue Life of Hot-Mix Asphalt Pavement
M Saghebfar, M Hossain, N Sabahfar
Proceedings of 12th International Society of Asphalt Pavement (ISAP …, 2014
2014
Evaluation of The Geometric Condition on Rail-Wheel Interaction Using the Finite Element Method
F Moghadas Nejad, M Afsharzad, M Saghebfar
Transportation Research Journal 6 (2), 163-173, 2009
2009
A Study On Wheel-Rail Contact Condition in Different Positions Of Wheel On Rail
F Moghadas Nejad, M Saghebfar
11th Conference on Rail Transportation , Iran (Islamic Republic of), 2009
2009
Sensitivity Analysis on Stress Distribution of Ballasted Railway Tracks incorporating Rail Pad Properties
F Moghadas Nejad, J Mirmohammadsadeghi, M Saghebfar
2nd International Conference on the Latest Progresses in Railway Engineering, 2009
2009
INSTRUMENTING AND MONITORING THE PERFORMANCE OF GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM
M Abu-Farsakh, M Saghebfar, A Ardah
系统目前无法执行此操作,请稍后再试。
文章 1–18