Factors causing rework and their impact on projects’ performance in Egypt AM Al-Janabi, MS Abdel-Monem, KM El-Dash Journal of Civil Engineering and Management 26 (7), 666-689, 2020 | 46 | 2020 |
Email-based system for documenting construction as-built details T Hegazy, M Abdel-Monem Automation in Construction 24, 130-137, 2012 | 39 | 2012 |
Risk factors causing cost overruns in road networks T Ammar, M Abdel-Monem, K El-Dash Ain Shams Engineering Journal 13 (5), 101720, 2022 | 32 | 2022 |
Enhancing construction as-built documentation using interactive voice response M Abdel-Monem, T Hegazy Journal of construction engineering and management 139 (7), 895-898, 2013 | 31 | 2013 |
Hands-On Exercise for Enhancing Students’ Construction Management Skills T Hegazy, M Abdel-Monem, DA Saad, R Rashedi Journal of Construction Engineering and Management 139 (9), 1135-1143, 2013 | 29 | 2013 |
Framework for enhanced progress tracking and control of linear projects T Hegazy, M Abdel-Monem, D Atef Saad Engineering, Construction and Architectural Management 21 (1), 94-110, 2014 | 25 | 2014 |
Balanced scorecard model for water utilities in Egypt M Abdelghany, M Abdel-Monem Water Practice & Technology 14 (1), 203-216, 2019 | 15 | 2019 |
Assessing Risk Factors Affecting the Accuracy of Conceptual Cost Estimation in the Middle East M Abdel-Monem, KT Alshaer, K El-Dash Buildings 12 (7), 950, 2022 | 13 | 2022 |
Multi-objective schedule optimization using constraint programming W Menesi, M Abdel-Monem, T Hegazy, Z Abuwarda | 11 | 2015 |
Prospects of mind maps for better visualization of infrastructure literature T Hegazy, A Ali, M Abdel-Monem Journal of Professional Issues in Engineering Education & Practice 137 (4 …, 2011 | 11 | 2011 |
Potential risks in civil infrastructure projects in Egypt K El-Dash, MA Monem Proceedings of III IPMA-ICEC International Expert Seminar, Bilbao, Spain, 6-8, 2004 | 6 | 2004 |
Appropriate budget contingency determination for construction projects: State-of-the-art T Ammar, M Abdel-Monem, K El-Dash Alexandria Engineering Journal 78, 88-103, 2023 | 5 | 2023 |
Modeling financial risk contributes to construction projects; case study of expansion food industries NA Gad, M Abdel-Monem, K El-Dash, M Abdel-Hamid HBRC Journal 18 (1), 85-106, 2022 | 4 | 2022 |
COST OVERRUN GAP ANALYSIS IN CONSTRUCTION PROJECTS: STATE-OF-THE-ART M Abdel-Monem, AR El-Mohr, K El-Dash Engineering Research Journal-Faculty of Engineering (Shoubra) 51 (3), 76-97, 2022 | 4 | 2022 |
Simplified IT tools for site information tracking M Abdel-Monem, T Hegazy CSCE Annual Conference, 2011 | 4 | 2011 |
AN INTENSIVE REVIEW ON HEALTH AND SAFELY FACTORS AFFECTING CONSTRUCTION PROJECTS'PRODUCTIVITY KM El-Dash, MS Abdel Monem, RL Mohammed Salih Journal of Al-Azhar University Engineering Sector 17 (62), 133-145, 2022 | 3 | 2022 |
Review study for rework causes in construction industry A Muwafaq, M Abdel-Monem, K El-Dash Civ Eng Res Mag (CERM) 42 (1), 20-35, 2020 | 3 | 2020 |
Automated system for documenting the evolution of as-built details during construction M Abdel-Monem, T Hegazy, DA Saad Transportation Research Board (TRB) 91st Annual Meeting, 2012 | 2 | 2012 |
Float loss impact on project cost M Magdy, M Abdel-Monem, K El Dash International Journal of Construction Management 22 (9), 1647-1656, 2022 | 1 | 2022 |
STUDYING THE LEVEL OF SERVICE OF TWO SIDED WEAVING SECTION ON URBAN ROADS I RAMADAN, M ABDEL-MONEM, MA IBRAHIM Engineering Research Journal-Faculty of Engineering (Shoubra) 51 (3), 67-75, 2022 | 1 | 2022 |