关注
Cheng Sim Lim
Cheng Sim Lim
Lecturer in Quantity Surveying, Universiti Tunku Abdul Rahman
在 utar.edu.my 的电子邮件经过验证 - 首页
标题
引用次数
引用次数
年份
Influential factors in estimating and tendering for construction work
TT Choon, LC Sim, T Connie, AK Nita, AG Uche, GK Chen
MATEC Web of Conferences 47, 04007, 2016
62016
BUILDING CONTRACTORS’AND CONSULTANT QUANITITY SURVEYORS’AWARENESS ON COST-SIGNIFICANT ELEMENTS OF HIGH-RISE CONDOMINIUM PROJECTS
CS Lim, WP Lee, TC Toh
International Journal of Business and Economy 3 (1), 1-20, 2021
12021
Measuring the likeliness among young adults to green their homes
TC Toh, KC Goh, HH Goh, FYY Yong, CS Lim, CK Lee
IOP Conference Series: Materials Science and Engineering 542 (1), 012016, 2019
12019
The Effect of Different Groupings of Building Elements on Cost Significant Elements and Their Cost Contributions to the Total Building Cost of a Block of Medium Cost Apartments …
CS Lim, TC Toh, WP Lee, SS Ng, CK Yong, KC Goh
Applied Mechanics and Materials 405, 3335-3339, 2013
12013
Statistical analysis of large building contractors’ awareness on cost-significant elements of high-rise condominium projects
CS Lim, WP Lee, TC Toh
Journal of Physics: Conference Series 1053 (1), 012140, 2018
2018
Quantity Surveying Undergraduates’ Awareness on Cost Significant of High-Rise Condominium Projects in Malaysia: The Case of a Private University in Malaysia
LW Peng, NS Seng, TT Choon, LC Sim, YC Khian, GK Chen
MATEC Web of Conferences 47, 04012, 2016
2016
A Preliminary Survey of Factors Influencing Project Cost Estimating Practice in the Klang Valley of Malaysia
TC Toh, CS Lim, C Ting, KN Ali, GU Aliagha, KC Goh
Applied Mechanics and Materials 470, 915-920, 2014
2014
Ranking the Building Construction Estimating Cost Factors using Terrell's Transformation Technique
TC Toh, C Ting, KN Ali, GU Aliagha, O Munir, CS Lim, PY Hee
2010
系统目前无法执行此操作,请稍后再试。
文章 1–8