Design and instrumentation of the structural pavement experiment at the NCAT test track DH Timm, AL Priest, TV McEwen National Center for Asphalt Technology (US), 2004 | 157 | 2004 |
Prediction of thermal crack spacing DH Timm, BB Guzina, VR Voller International Journal of Solids and Structures 40 (1), 125-142, 2003 | 111 | 2003 |
Perpetual pavement design for flexible pavements in the US DH Timm, DE Newcomb International Journal of Pavement Engineering 7 (2), 111-119, 2006 | 107 | 2006 |
Low temperature cracking of asphalt concrete pavement MO Marasteanu, X Li, TR Clyne, V Voller, DH Timm, D Newcomb | 100 | 2004 |
Phase IV NCAT pavement test track findings: Draft Report R West, D Timm, JR Willis, R Powell, N Tran, D Watson, M Sakhaeifar, ... | 94 | 2012 |
Calcool: A multi-layer asphalt pavement cooling tool for temperature prediction during construction DH Timm, VR Voller, E Lee, J Harvey International Journal of Pavement Engineering 2 (3), 169-185, 2001 | 92 | 2001 |
An asphalt paving tool for adverse conditions BA Chadbourn, DE Newcomb, VR Voller, RA DeSombre, JA Luoma, ... | 86 | 1998 |
Development of mechanistic-empirical pavement design in Minnesota D Timm, B Birgisson, D Newcomb Transportation Research Record 1629 (1), 181-188, 1998 | 82 | 1998 |
Methodology and calibration of fatigue transfer functions for mechanistic empirical flexible pavement design AL Priest, DH Timm | 81 | 2006 |
Design, construction, and instrumentation of the 2006 test track structural study DH Timm Report, 2009 | 75 | 2009 |
Wheel wander at the NCAT test track DH Timm, AL Priest Report, 2005 | 72 | 2005 |
Axle load spectra characterization by mixed distribution modeling DH Timm, SM Tisdale, RE Turochy Journal of Transportation Engineering 131 (2), 83-88, 2005 | 69 | 2005 |
Material properties of the 2003 NCAT test track structural study DH Timm, AL Priest Report, 2006 | 66 | 2006 |
Rutting characterization of warm mix asphalt and high RAP mixtures A Vargas-Nordcbeck, DH Timm Road Materials and Pavement Design 13 (sup1), 1-20, 2012 | 62 | 2012 |
Phase III NCAT test track findings R Willis, D Timm, R West, B Powell, M Robbins, A Taylor, A Smit, N Tran, ... NCAT report, 09-08, 2009 | 60 | 2009 |
Phase II NCAT test track results. D Timm, RC West, A Priest, B Powell, I Selvaraj, J Zhang, R Brown United States. Federal Highway Administration, 2006 | 60 | 2006 |
Incorporation of reliability into mechanistic-empirical pavement design DH Timm, DE Newcomb, TV Galambos Transportation Research Record 1730 (1), 73-80, 2000 | 60 | 2000 |
Incorporation of reliability into the Minnesota mechanistic-empirical pavement design method DH Timm, DE Newcomb, B Birgisson, TV Galambos | 60 | 1999 |
Perpetual asphalt pavements: A synthesis DE Newcomb, R Willis, DH Timm | 58 | 2010 |
A study of manual vs. automated pavement condition surveys DH Timm, JM McQueen Alabama, EE. UU: Auburn University, 2004 | 57 | 2004 |