Optimizing material procurement and storage on construction sites H Said, K El-Rayes Journal of Construction Engineering and Management 137 (6), 421-431, 2011 | 150 | 2011 |
Dynamic site layout planning using approximate dynamic programming K El-Rayes, H Said Journal of Computing in Civil Engineering 23 (2), 119-127, 2009 | 122 | 2009 |
Automated multi-objective construction logistics optimization system H Said, K El-Rayes Automation in Construction 43, 110-122, 2014 | 118 | 2014 |
Performance of global optimization models for dynamic site layout planning of construction projects H Said, K El-Rayes Automation in Construction 36, 71-78, 2013 | 100 | 2013 |
Optimal utilization of interior building spaces for material procurement and storage in congested construction sites H Said, K El-Rayes Automation in Construction 31, 292-306, 2013 | 84 | 2013 |
Prefabrication best practices and improvement opportunities for electrical construction H Said Journal of Construction Engineering and Management 141 (12), 04015045, 2015 | 73 | 2015 |
Exterior prefabricated panelized walls platform optimization HM Said, T Chalasani, S Logan Automation in Construction 76, 1-13, 2017 | 71 | 2017 |
GIS-based dynamic construction site material layout evaluation for building renovation projects X Su, A rahman Andoh, H Cai, J Pan, A Kandil, HM Said Automation in Construction 27, 40-49, 2012 | 71 | 2012 |
Optimizing the planning of construction site security for critical infrastructure projects H Said, K El-Rayes Automation in Construction 19 (2), 221-234, 2010 | 57 | 2010 |
Utilizing telematics data to support effective equipment fleet-management decisions: Utilization rate and hazard functions H Said, T Nicoletti, P Perez-Hernandez Journal of Computing in Civil Engineering 30 (1), 04014122, 2016 | 41 | 2016 |
Application of computer simulation to bridge deck construction: Case study H Said, M Marzouk, M El-Said Automation in Construction 18 (4), 377-385, 2009 | 41 | 2009 |
Special-purpose simulation model for balanced cantilever bridges M Marzouk, H Said, M El-Said Journal of Bridge Engineering 13 (2), 122-131, 2008 | 36 | 2008 |
Modeling and likelihood prediction of prefabrication feasibility for electrical construction firms H Said Journal of Construction Engineering and Management 142 (2), 04015071, 2016 | 34 | 2016 |
Future trends of sustainability design and analysis in construction industry and academia H Said, L Berger Practice Periodical on Structural Design and Construction 19 (1), 77-88, 2014 | 33 | 2014 |
Optimal material logistics planning in congested construction sites H Said, K El-Rayes Construction Research Congress 2012: Construction Challenges in a Flat World …, 2012 | 28 | 2012 |
Financial evaluation for toll road projects considering traffic volume and serviceability interactions T Jeerangsuwan, H Said, A Kandil, S Ukkusuri Journal of Infrastructure Systems 20 (3), 04014012, 2014 | 26 | 2014 |
Framework for multiobjective optimization of launching girder bridges M Marzouk, H Said, M El-Said Journal of Construction Engineering and Management 135 (8), 791-800, 2009 | 26 | 2009 |
Construction spatial modeling and scheduling with three-dimensional singularity functions G Lucko, HMM Said, A Bouferguene Automation in Construction 43, 132-143, 2014 | 24 | 2014 |
Impact of design changes on virtual design and construction performance for electrical contractors HM Said, J Reginato Journal of Construction Engineering and Management 144 (1), 04017097, 2018 | 23 | 2018 |
Analysis of the growth dynamics and structure of the modular building construction industry H Said, AR Ali, M Alshehri Construction Research Congress 2014: Construction in a Global Network, 1977-1986, 2014 | 21 | 2014 |