Overcoming resistance to change in engineering and construction: Change management factors for owner organizations BC Lines, KT Sullivan, JB Smithwick, J Mischung International journal of project management 33 (5), 1170-1179, 2015 | 228 | 2015 |
Drivers of organizational change within the AEC industry: Linking change management practices with successful change adoption BC Lines, PK Reddy Vardireddy Journal of management in engineering 33 (6), 04017031, 2017 | 55 | 2017 |
Empirical study of the current United States facilities management profession K Sullivan, SW Georgoulis, B Lines Journal of Facilities Management 8 (2), 91-103, 2010 | 55 | 2010 |
Using best-value procurement to measure the impact of initial risk-management capability on qualitative construction performance A Perrenoud, BC Lines, J Savicky, KT Sullivan Journal of Management in Engineering 33 (5), 04017019, 2017 | 47 | 2017 |
Change management practices for adopting new technologies in the design and construction industry O Maali, B Lines, J Smithwick, K Hurtado, K Sullivan Journal of Information Technology in Construction 25, 325-341, 2020 | 43 | 2020 |
Planning in construction: Longitudinal study of pre-contract planning model demonstrates reduction in project cost and schedule growth BC Lines, KT Sullivan, KC Hurtado, J Savicky International Journal of Construction Education and Research 11 (1), 21-39, 2015 | 41 | 2015 |
Application of lean six sigma to improve service in healthcare facilities management: a case study WT Shirey, KT Sullivan, B Lines, J Smithwick Journal of Facility Management Education and Research 1 (1), 9-18, 2017 | 39 | 2017 |
Support for organizational change: Change-readiness outcomes among AEC project teams BC Lines, KT Sullivan, A Wiezel Journal of Construction Engineering and Management 142 (2), 04015062, 2016 | 37 | 2016 |
Best-value procurement in design-bid-build construction projects: Empirical analysis of selection outcomes PHD Nguyen, BC Lines, DQ Tran Journal of Construction Engineering and Management 144 (10), 04018093, 2018 | 28 | 2018 |
Best practices for organizational change management within electrical contractors BC Lines, JB Smithwick International journal of construction education and research 15 (2), 136-159, 2019 | 25 | 2019 |
Implementing project delivery process improvements: Identification of resistance types and frequencies BC Lines, AJ Perrenoud, KT Sullivan, DT Kashiwag, A Pesek Journal of Management in Engineering 33 (1), 04016031, 2017 | 24 | 2017 |
Measuring risk management performance within a capital program A J. Perrenoud, B C. Lines, K T. Sullivan Journal of Facilities Management 12 (2), 158-171, 2014 | 21 | 2014 |
Fuzzy set theory approach to classify highway project characteristics for delivery selection PHD Nguyen, D Tran, BC Lines Journal of construction engineering and management 146 (5), 04020044, 2020 | 20 | 2020 |
Organizational change models: a critical review of change management processes K Sullivan, D Kashiwagi, B Lines RICS Construction and Property Conference, 302, 2011 | 18 | 2011 |
Strategies to achieve high adoption of organizational change initiatives within the AEC industry O Maali, N Kepple, B Lines Journal of management in engineering 38 (4), 04022021, 2022 | 14 | 2022 |
Best practices of organizational change for adopting alternative project delivery methods in the AEC industry KM Aldossari, BC Lines, JB Smithwick, KC Hurtado, KT Sullivan Engineering, construction and architectural management 28 (4), 1060-1082, 2021 | 14 | 2021 |
Empirical inference system for highway project delivery selection using fuzzy pattern recognition PHD Nguyen, DQ Tran, BC Lines Journal of Construction Engineering and Management 146 (12), 04020141, 2020 | 12 | 2020 |
Construction workforce challenges and solutions: A national study of the roofing sector in the United States HH Delvinne, K Hurtado, J Smithwick, B Lines, K Sullivan Construction Research Congress 2020, 529-537, 2020 | 12 | 2020 |
Differentiation of evaluation criteria in design-build and construction manager at risk procurements A Shalwani, BC Lines, JB Smithwick Journal of Management in Engineering 35 (5), 04019017, 2019 | 12 | 2019 |
Employee reactions to adoption of alternative project delivery methods within the AEC industry KM Aldossari, BC Lines, JB Smithwick, KC Hurtado, KT Sullivan International journal of construction education and research 19 (1), 4-21, 2023 | 10 | 2023 |