Improving value generation in the design process of industrial projects using CAVT L Rischmoller, LF Alarcón, L Koskela Journal of management in engineering 22 (2), 52-60, 2006 | 80 | 2006 |
4D planning and scheduling (4D-PS): Grounding construction IT research in industry practice L Rischmoller, M Fischer, R Fox, L Alarcón Proc., Construction Information Technology CIB W78. Int. Conf.: IT in …, 2001 | 41 | 2001 |
Integration enabled by virtual design & construction as a lean implementation strategy L Rischmoller, D Reed, A Khanzode, M Fischer Proc. 26th Annual Conference of the International. Group for Lean …, 2018 | 34 | 2018 |
4D-PS: Putting an IT new work process into effect L Rischmoller, LF Alarcón Proceedings of CIB w78 2002 Conference on Construction Information …, 2002 | 32 | 2002 |
Impacto de las herramientas avanzadas de visualización en la Industria AEC L Rischmoller, LF Alarcón, M Fischer, R Fox Revista ingeniería de construcción 17 (2), 64-73, 2002 | 24* | 2002 |
Design of buffers in repetitive projects: using production management theory and IT tools V González, L Rischmoller, LF Alarcón 4th International Postgraduate Research Conference, University of Salford …, 2004 | 17 | 2004 |
Preplanning: a rewarding experience VA Ghio, E Valle, L Rischmoller Retrieved October 11, 2002, 1997 | 16 | 1997 |
Design Thinking in action: A DPR case study to develop a sustainable digital solution for labor resource management B Zhang, N Dong, L Rischmoller Annual Conference of the International Group for Lean Construction, 2020 | 11 | 2020 |
A study of virtual design and construction implementation and benefits using a bayesian approach L Rischmoller, M Fischer, J Kunz Revista de la Construcción 11 (3), 74-87, 2012 | 11 | 2012 |
Using 4D in a new “2D+ time” Conceptualization L Rischmoller, E Valle Proceedings of CIB 78 22nd Conference on Information Technology in …, 2005 | 8 | 2005 |
Using lean principles as a framework to study information technology in construction L Rischmoller, LF Alarcón 13th International group for lean construction conference: proceedings, 171-178, 2005 | 7 | 2005 |
Automation of the building information model breakdown structure L Rischmoller, N Dong, M Fischer, A Khanzode 25th Annual Conference of the International Group for Lean Construction …, 2017 | 6 | 2017 |
Automation and Visualization Tools to Improve Support for Process Integration in the Construction Industry L Rischmoller, R Fox, M Williams, L ALARCON International Conference in Construction Information Technology, 17-18, 2000 | 6 | 2000 |
4D Planning & Scheduling: Grounding Construction IT Research in Industry Practice L Rischmoller, M Fisher, R Fox, L Alarcon Proceedings of CIB W78 Conference, Construction Information Technology, Iceland, 2000 | 5 | 2000 |
Improving on-site meeting efficiency by using an automated model breakdown tool L Rischmoller, N Dong, M Fischer, A Khanzode 25th Annual Conference of the International Group for Lean Construction …, 2017 | 4 | 2017 |
Integrating delivery of a large hospital complex D Reed, H Ashcraft, A Khanzode, M Fischer, L Rischmoller, P Berg Proceedings of the 25th Annual Conference of the International Group for …, 2017 | 4 | 2017 |
Reflections about nD modeling and Computer Advanced Visualization Tools L Rischmoller, R Matamala Developing a Vision of nD-Enabled Construction, Salford Centre for Research …, 2003 | 3 | 2003 |
Design process embracing lean principles and its research LF Alarcón, J Friere, L Rischmoller INTERNATIONAL JOURNAL OF ARCHITECTURAL MANAGEMENT PRACTICE AND RESEARCH, 1-17, 1999 | 3 | 1999 |
Ingeniería y Gestión de la Construcción a través de Virtual Design and Construction (VDC) L Rischmoller Universidad Peruana de Ciencias Aplicadas (UPC), 2015 | 2 | 2015 |
Management of Buffers in Repetitive Projects: Using Production Management Theory and IT Tools V González, L Rischmoller, LF Alarcón PhD Summer School, IGLC, 2004 | 2 | 2004 |