Finance-based scheduling: Tool to maximize project profit using improved genetic algorithms AM Elazouni, FG Metwally Journal of Construction Engineering and Management 131 (4), 400-412, 2005 | 147 | 2005 |
Finance-based scheduling of construction projects using integer programming AM Elazouni, AA Gab-Allah Journal of construction engineering and management 130 (1), 15-24, 2004 | 138 | 2004 |
D-SUB: Decision support system for subcontracting construction works AM Elazouni, FG Metwally Journal of construction engineering and management 126 (3), 191-200, 2000 | 99 | 2000 |
Heuristic method for multi‐project finance‐based scheduling A Elazouni Construction Management and Economics 27 (2), 199-211, 2009 | 94 | 2009 |
Expanding finance-based scheduling to devise overall-optimized project schedules AM Elazouni, FG Metwally Journal of Construction Engineering and Management 133 (1), 86-90, 2007 | 74 | 2007 |
Generic scheduling optimization model for multiple construction projects MS El-Abbasy, A Elazouni, T Zayed Journal of computing in civil engineering 31 (4), 04017003, 2017 | 67 | 2017 |
Finance‐based CPM/LOB scheduling of projects with repetitive non‐serial activities MM Ali, A Elazouni Construction management and economics 27 (9), 839-856, 2009 | 67 | 2009 |
Estimating the acceptability of new formwork systems using neural networks AM Elazouni, AE Ali, RH Abdel-Razek Journal of Construction Engineering and management 131 (1), 33-41, 2005 | 64 | 2005 |
Discrete-event simulation-based method for staffing highway maintenance crews AM Elazouni US Patent 5,617,342, 1997 | 60 | 1997 |
Multiobjective evolutionary finance-based scheduling: Entire projects’ portfolio MA Abido, AM Elazouni Journal of Computing in Civil Engineering 25 (1), 85-97, 2011 | 59 | 2011 |
Classifying construction contractors using unsupervised-learning neural networks AM Elazouni Journal of construction engineering and management 132 (12), 1242-1253, 2006 | 55 | 2006 |
Multiobjective evolutionary finance-based scheduling: Individual projects within a portfolio A Elazouni, M Abido Automation in Construction 20 (7), 755-766, 2011 | 52 | 2011 |
Estimating resource requirements at conceptual design stage using neural networks AM Elazouni, IA Nosair, YA Mohieldin, AG Mohamed Journal of Computing in Civil Engineering 11 (4), 217-223, 1997 | 48 | 1997 |
MOSCOPEA: Multi-objective construction scheduling optimization using elitist non-dominated sorting genetic algorithm MS El-Abbasy, A Elazouni, T Zayed Automation in Construction 71, 153-170, 2016 | 47 | 2016 |
Method and apparatus for finance-based scheduling of construction projects A Elazouni US Patent 7,644,007, 2010 | 43 | 2010 |
Performance of shuffled frog-leaping algorithm in finance-based scheduling A Alghazi, SZ Selim, A Elazouni Journal of computing in civil engineering 26 (3), 396-408, 2012 | 41 | 2012 |
Improved genetic algorithm for finance-based scheduling A Alghazi, A Elazouni, S Selim Journal of Computing in Civil Engineering 27 (4), 379-394, 2013 | 40 | 2013 |
Finance-based scheduling multi-objective optimization: Benchmarking of evolutionary algorithms MS El-Abbasy, A Elazouni, T Zayed Automation in Construction 120, 103392, 2020 | 39 | 2020 |
Evaluating the performance of construction equipment operators in Egypt AM Elazouni, IM Basha Journal of construction engineering and management 122 (2), 109-114, 1996 | 38 | 1996 |
Enhanced heuristic for finance-based scheduling of construction projects Y Gajpal, A Elazouni Construction Management and Economics 33 (7), 531-553, 2015 | 33 | 2015 |