Finance-based scheduling: Tool to maximize project profit using improved genetic algorithms
AM Elazouni, FG Metwally
Journal of Construction Engineering and Management 131 (4), 400-412, 2005
1472005
Finance-based scheduling of construction projects using integer programming
AM Elazouni, AA Gab-Allah
Journal of construction engineering and management 130 (1), 15-24, 2004
1382004
D-SUB: Decision support system for subcontracting construction works
AM Elazouni, FG Metwally
Journal of construction engineering and management 126 (3), 191-200, 2000
992000
Heuristic method for multi‐project finance‐based scheduling
A Elazouni
Construction Management and Economics 27 (2), 199-211, 2009
942009
Expanding finance-based scheduling to devise overall-optimized project schedules
AM Elazouni, FG Metwally
Journal of Construction Engineering and Management 133 (1), 86-90, 2007
742007
Generic scheduling optimization model for multiple construction projects
MS El-Abbasy, A Elazouni, T Zayed
Journal of computing in civil engineering 31 (4), 04017003, 2017
672017
Finance‐based CPM/LOB scheduling of projects with repetitive non‐serial activities
MM Ali, A Elazouni
Construction management and economics 27 (9), 839-856, 2009
672009
Estimating the acceptability of new formwork systems using neural networks
AM Elazouni, AE Ali, RH Abdel-Razek
Journal of Construction Engineering and management 131 (1), 33-41, 2005
642005
Discrete-event simulation-based method for staffing highway maintenance crews
AM Elazouni
US Patent 5,617,342, 1997
601997
Multiobjective evolutionary finance-based scheduling: Entire projects’ portfolio
MA Abido, AM Elazouni
Journal of Computing in Civil Engineering 25 (1), 85-97, 2011
592011
Classifying construction contractors using unsupervised-learning neural networks
AM Elazouni
Journal of construction engineering and management 132 (12), 1242-1253, 2006
552006
Multiobjective evolutionary finance-based scheduling: Individual projects within a portfolio
A Elazouni, M Abido
Automation in Construction 20 (7), 755-766, 2011
522011
Estimating resource requirements at conceptual design stage using neural networks
AM Elazouni, IA Nosair, YA Mohieldin, AG Mohamed
Journal of Computing in Civil Engineering 11 (4), 217-223, 1997
481997
MOSCOPEA: Multi-objective construction scheduling optimization using elitist non-dominated sorting genetic algorithm
MS El-Abbasy, A Elazouni, T Zayed
Automation in Construction 71, 153-170, 2016
472016
Method and apparatus for finance-based scheduling of construction projects
A Elazouni
US Patent 7,644,007, 2010
432010
Performance of shuffled frog-leaping algorithm in finance-based scheduling
A Alghazi, SZ Selim, A Elazouni
Journal of computing in civil engineering 26 (3), 396-408, 2012
412012
Improved genetic algorithm for finance-based scheduling
A Alghazi, A Elazouni, S Selim
Journal of Computing in Civil Engineering 27 (4), 379-394, 2013
402013
Finance-based scheduling multi-objective optimization: Benchmarking of evolutionary algorithms
MS El-Abbasy, A Elazouni, T Zayed
Automation in Construction 120, 103392, 2020
392020
Evaluating the performance of construction equipment operators in Egypt
AM Elazouni, IM Basha
Journal of construction engineering and management 122 (2), 109-114, 1996
381996
Enhanced heuristic for finance-based scheduling of construction projects
Y Gajpal, A Elazouni
Construction Management and Economics 33 (7), 531-553, 2015