Scheduling flexible flow lines with sequence-dependent setup times ME Kurz, RG Askin European Journal of Operational Research 159 (1), 66-82, 2004 | 334 | 2004 |
Dynamic rescheduling that simultaneously considers efficiency and stability R Rangsaritratsamee, WG Ferrell Jr, MB Kurz Computers & Industrial Engineering 46 (1), 1-15, 2004 | 289 | 2004 |
Comparing scheduling rules for flexible flow lines ME Kurz, RG Askin International Journal of Production Economics 85 (3), 371-388, 2003 | 205 | 2003 |
Heuristic scheduling of parallel machines with sequence-dependent set-up times ME Kurz, RG Askin International journal of production research 39 (16), 3747-3769, 2001 | 137 | 2001 |
A memetic random-key genetic algorithm for a symmetric multi-objective traveling salesman problem F Samanlioglu, WG Ferrell Jr, ME Kurz Computers & Industrial Engineering 55 (2), 439-449, 2008 | 99 | 2008 |
The minimum p-envy location problem: a new model for equitable distribution of emergency resources S Chanta, ME Mayorga, ME Kurz, LA McLay IIE Transactions on Healthcare Systems Engineering 1 (2), 101-115, 2011 | 78 | 2011 |
Multi-objective analysis of an integrated supply chain scheduling problem E Cakici, SJ Mason, ME Kurz International Journal of Production Research 50 (10), 2624-2638, 2012 | 73 | 2012 |
Multi-level inventory management decisions with transportation cost consideration A Madadi, ME Kurz, J Ashayeri Transportation Research Part E: Logistics and Transportation Review 46 (5 …, 2010 | 73 | 2010 |
Mixed model line balancing with parallel stations, zoning constraints, and ergonomics A Alghazi, ME Kurz Constraints 23 (1), 123-153, 2018 | 49 | 2018 |
Two-stage hybrid flow shop batching and lot streaming with variable sublots and sequence-dependent setups S Wang, M Kurz, SJ Mason, E Rashidi International journal of production research 57 (22), 6893-6907, 2019 | 43 | 2019 |
Supply network design: Risk-averse or risk-neutral? AR Madadi, ME Kurz, KM Taaffe, JL Sharp, SJ Mason Computers & Industrial Engineering 78, 55-65, 2014 | 42 | 2014 |
Minimizing total weighted tardiness on a batch-processing machine with incompatible job families and job ready times ME Kurz, SJ Mason International Journal of Production Research 46 (1), 131-151, 2008 | 38 | 2008 |
Virtual reality training integrated curriculum: An aircraft maintenance technology (AMT) education perspective TD Rupasinghe, ME Kurz, C Washburn, AK Gramopadhye International journal of engineering education 27 (4), 778, 2011 | 37 | 2011 |
An effective integer program for a general assembly line balancing problem with parallel workers and additional assignment restrictions BW Pearce, K Antani, L Mears, K Funk, ME Mayorga, ME Kurz Journal of Manufacturing Systems 50, 180-192, 2019 | 35 | 2019 |
Effects of exposure on attitudes towards STEM interests M Elizabeth Kurz, SE Yoder, L Zu Education 136 (2), 229-241, 2015 | 33 | 2015 |
Supply chain design under quality disruptions and tainted materials delivery AR Madadi, ME Kurz, SJ Mason, KM Taaffe Transportation Research Part E: Logistics and Transportation Review 67, 105-123, 2014 | 32 | 2014 |
A branch and bound algorithm to minimise total weighted tardiness on a single batch processing machine with ready times and incompatible job families SK Tangudu, ME Kurz Production Planning & Control 17 (7), 728-741, 2006 | 32 | 2006 |
An adaptable problem-space-based search method for flexible flow line scheduling ME Kurz, RG Askin IIE Transactions 33 (8), 691-693, 2001 | 27 | 2001 |
A hybrid random-key genetic algorithm for a symmetric travelling salesman problem F Samanlioglu, MB Kurz, WG Ferrell, S Tangudu International Journal of Operational Research 2 (1), 47-63, 2007 | 25 | 2007 |
Multiobjective single machine scheduling with nontraditional requirements U Haral, RW Chen, WG Ferrell Jr, MB Kurz International Journal of production economics 106 (2), 574-584, 2007 | 22 | 2007 |