关注
Valentina Cacchiani
Valentina Cacchiani
在 unibo.it 的电子邮件经过验证
标题
引用次数
引用次数
年份
An overview of recovery models and algorithms for real-time railway rescheduling
V Cacchiani, D Huisman, M Kidd, L Kroon, P Toth, L Veelenturf, ...
Transportation Research Part B: Methodological 63, 15-37, 2014
7772014
Nominal and robust train timetabling problems
V Cacchiani, P Toth
European Journal of Operational Research 219 (3), 727-737, 2012
4662012
Scheduling extra freight trains on railway networks
V Cacchiani, A Caprara, P Toth
Transportation Research Part B: Methodological 44 (2), 215-231, 2010
2832010
A railway timetable rescheduling approach for handling large-scale disruptions
LP Veelenturf, MP Kidd, V Cacchiani, LG Kroon, P Toth
Transportation Science 50 (3), 841-862, 2016
2202016
A column generation approach to train timetabling on a corridor
V Cacchiani, A Caprara, P Toth
4OR: A Quarterly Journal of Operations Research 6 (2), 125-142, 2008
1652008
A set-covering based heuristic algorithm for the periodic vehicle routing problem
V Cacchiani, VC Hemmelmayr, F Tricoire
Discrete Applied Mathematics 163, 53-64, 2014
1412014
Knapsack problems-An overview of recent advances. Part II: Multiple, multidimensional, and quadratic knapsack problems
V Cacchiani, M Iori, A Locatelli, S Martello
Computers & Operations Research 143, 105693, 2022
1302022
A Lagrangian heuristic for robustness, with an application to train timetabling
V Cacchiani, A Caprara, M Fischetti
Transportation Science 46 (1), 124-133, 2012
1262012
Train timetabling by skip-stop planning in highly congested lines
F Jiang, V Cacchiani, P Toth
Transportation Research Part B: Methodological 104, 149-174, 2017
1242017
Solving a real-world train-unit assignment problem
V Cacchiani, A Caprara, P Toth
Mathematical programming 124 (1), 207-231, 2010
1232010
A three-level framework for performance-based railway timetabling
RMP Goverde, N Bešinović, A Binder, V Cacchiani, E Quaglietta, ...
Transportation Research Part C: Emerging Technologies 67, 62-83, 2016
1222016
An overview of curriculum-based course timetabling
A Bettinelli, V Cacchiani, R Roberti, P Toth
TOP 23 (2), 313-349, 2015
1162015
Railway Rolling Stock Planning: Robustness Against Large Disruptions
V Cacchiani, A Caprara, L Galli, L Kroon, G Maróti, P Toth
Transportation Science 46 (2), 217-232, 2012
1092012
Approaches to a real-world train timetabling problem in a railway node
V Cacchiani, F Furini, MP Kidd
Omega 58, 97-110, 2016
1042016
Robust optimization models for integrated train stop planning and timetabling with passenger demand uncertainty
V Cacchiani, J Qi, L Yang
Transportation Research Part B: Methodological 136, 1-29, 2020
902020
A hybrid approach to beam angle optimization in intensity-modulated radiation therapy
D Bertsimas, V Cacchiani, D Craft, O Nohadani
Computers & Operations Research 40 (9), 2187-2197, 2013
872013
Optimal solutions to a real-world integrated airline scheduling problem
V Cacchiani, JJ Salazar-González
Transportation Science 51 (1), 250-268, 2017
792017
Non-cyclic train timetabling and comparability graphs
V Cacchiani, A Caprara, P Toth
Operations Research Letters 38 (3), 179-184, 2010
752010
A branch-and-bound algorithm for the knapsack problem with conflict graph
A Bettinelli, V Cacchiani, E Malaguti
INFORMS Journal on Computing 29 (3), 457-473, 2017
742017
A tutorial on non-periodic train timetabling and platforming problems
V Cacchiani, L Galli, P Toth
EURO Journal on Transportation and Logistics 4 (3), 285-320, 2015
732015
系统目前无法执行此操作,请稍后再试。
文章 1–20