关注
Susan M. Bogus
Susan M. Bogus
在 unm.edu 的电子邮件经过验证
标题
引用次数
引用次数
年份
Mixed logit model-based driver injury severity investigations in single-and multi-vehicle crashes on rural two-lane highways
Q Wu, F Chen, G Zhang, XC Liu, H Wang, SM Bogus
Accident Analysis & Prevention 72, 105-115, 2014
2182014
Concurrent engineering approach to reducing design delivery time
SM Bogus, KR Molenaar, JE Diekmann
Journal of construction engineering and management 131 (11), 1179-1185, 2005
1452005
An exploratory study of the relationship between construction workforce physical strain and task level productivity
UC Gatti, GC Migliaccio, SM Bogus, S Schneider
Construction management and economics 32 (6), 548-564, 2014
862014
Hierarchical Bayesian random intercept model-based cross-level interaction decomposition for truck driver injury severity investigations
C Chen, G Zhang, Z Tian, SM Bogus, Y Yang
Accident Analysis & Prevention 85, 186-198, 2015
822015
Sensitivity of construction activities under design uncertainty
NA Blacud, SM Bogus, JE Diekmann, KR Molenaar
Journal of Construction Engineering and Management 135 (3), 199-206, 2009
712009
Strategies for overlapping dependent design activities
SM Bogus, KR Molenaar, JE Diekmann
Construction Management and Economics 24 (8), 829-837, 2006
682006
Municipal water/wastewater project delivery performance comparison
JS Shane, SM Bogus, KR Molenaar
Journal of management in engineering 29 (3), 251-258, 2013
602013
Simulation of overlapping design activities in concurrent engineering
SM Bogus, JE Diekmann, KR Molenaar, C Harper, S Patil, JS Lee
Journal of Construction Engineering and Management 137 (11), 950-957, 2011
592011
Real-time occupancy estimation using WiFi network to optimize HVAC operation
KCJ Simma, A Mammoli, SM Bogus
Procedia Computer Science 155, 495-502, 2019
562019
Design/build for water/wastewater facilities: State of the industry survey and three case studies
KR Molenaar, SM Bogus, JM Priestley
Journal of Management in Engineering 20 (1), 16-24, 2004
492004
Identification of social sustainability criteria in building energy retrofit projects
A Jafari, V Valentin, SM Bogus
Journal of construction engineering and management 145 (2), 04018136, 2019
472019
Contract payment provisions and project performance: An analysis of municipal water and wastewater facilities
SM Bogus, JS Shane, KR Molenaar
Public Works Management & Policy 15 (1), 20-31, 2010
442010
Study of the relationship between procurement duration and project performance in design-build projects: Comparison between water/wastewater and transportation sectors
SM Bogus, GC Migliaccio, R Jin
Journal of Management in Engineering 29 (4), 382-391, 2013
402013
Characterizing pavement surface distress conditions with hyper-spatial resolution natural color aerial photography
S Zhang, CD Lippitt, SM Bogus, PRH Neville
Remote Sensing 8 (5), 392, 2016
362016
Using workforce’s physiological strain monitoring to enhance social sustainability of construction
U Gatti, G Migliaccio, SM Bogus, S Priyadarshini, A Scharrer
Journal of architectural engineering 19 (3), 179-185, 2013
332013
Effect of duration of design–build procurement on performance of transportation projects
GC Migliaccio, SM Bogus, A Chen
Transportation research record 2151 (1), 67-73, 2010
332010
Rank correlation method for evaluating manual pavement distress data variability
SM Bogus, J Song, R Waggerman, LR Lenke
Journal of Infrastructure Systems 16 (1), 66-72, 2010
322010
Assessing the link between public opinion and social sustainability in building and infrastructure projects
V Valentin, SM Bogus
Journal of green building 10 (3), 177-190, 2015
292015
Assessment of data quality for evaluations of manual pavement distress
SM Bogus, GC Migliaccio, AA Cordova
Transportation research record 2170 (1), 1-8, 2010
242010
The accuracy of aerial triangulation products automatically generated from hyper-spatial resolution digital aerial photography
S Zhang, CD Lippitt, SM Bogus, AC Loerch, JO Sturm
Remote Sensing Letters 7 (2), 160-169, 2016
232016
系统目前无法执行此操作,请稍后再试。
文章 1–20