Linear and nonlinear preventive maintenance models S Wu, MJ Zuo IEEE transactions on reliability 59 (1), 242-249, 2010 | 230 | 2010 |
A Review on Coarse Warranty Data and Analysis S Wu Reliability Engineering and System Safety, 2013 | 181 | 2013 |
Warranty data analysis: A review S Wu Quality and Reliability Engineering International 28 (8), 795-805, 2012 | 155 | 2012 |
Repairing concavities in ROC curves. PA Flach, S Wu IJCAI, 702-707, 2005 | 142 | 2005 |
A condition-based maintenance policy for degrading systems with age-and state-dependent operating cost B Liu, S Wu, M Xie, W Kuo European Journal of Operational Research 263 (3), 879-887, 2017 | 139 | 2017 |
Resilience analysis of maritime transportation systems based on importance measures H Dui, X Zheng, S Wu Reliability Engineering & System Safety 209, 107461, 2021 | 127 | 2021 |
Optimising age-replacement and extended non-renewing warranty policies in lifecycle costing S Wu, P Longhurst International Journal of Production Economics 130 (2), 262-267, 2011 | 126 | 2011 |
Preventive maintenance models with random maintenance quality S Wu, D Clements-Croome Reliability Engineering & System Safety 90 (1), 99-105, 2005 | 124 | 2005 |
Performance utility-analysis of multi-state systems S Wu, LY Chan IEEE Transactions on Reliability 52 (1), 14-21, 2003 | 110 | 2003 |
Reliability analysis of two-unit cold standby repairable systems under Poisson shocks Q Wu, S Wu Applied Mathematics and computation 218 (1), 171-182, 2011 | 109 | 2011 |
Construction of asymmetric copulas and its application in two-dimensional reliability modelling S Wu European Journal of Operational Research 238 (2), 476-485, 2014 | 106 | 2014 |
Joint importance of multistate systems S Wu Computers & Industrial Engineering 49 (1), 63-75, 2005 | 103 | 2005 |
Optimal maintenance policies under different operational schedules S Wu, D Clements-Croome IEEE Transactions on Reliability 54 (2), 338-346, 2005 | 100 | 2005 |
Reliability in the whole life cycle of building systems S Wu, D Clements‐Croome, V Fairey, B Albany, J Sidhu, D Desmond, ... Engineering, Construction and Architectural Management 13 (2), 136-153, 2006 | 99 | 2006 |
Linking component importance to optimisation of preventive maintenance policy S Wu, Y Chen, Q Wu, Z Wang Reliability Engineering & System Safety 146, 26-32, 2016 | 91 | 2016 |
A cost-based importance measure for system components: An extension of the Birnbaum importance S Wu, FPA Coolen European Journal of Operational Research 225 (1), 189-195, 2013 | 85 | 2013 |
Optimizing replacement policy for a cold-standby system with waiting repair times J Jia, S Wu Applied Mathematics and computation 214 (1), 133-141, 2009 | 85 | 2009 |
A scored AUC metric for classifier evaluation and selection S Wu, P Flach Second workshop on ROC analysis in ML, bonn, Germany, 2005 | 84 | 2005 |
An elitist quantum-inspired evolutionary algorithm for the flexible job-shop scheduling problem X Wu, S Wu Journal of Intelligent Manufacturing 28, 1441-1457, 2017 | 81 | 2017 |
Support vector regression for warranty claim forecasting S Wu, A Akbarov European Journal of Operational Research 213 (1), 196-204, 2011 | 78 | 2011 |