Grey Wolf Optimizer algorithm for the two-stage assembly flow shop scheduling problem with release time GM Komaki, V Kayvanfar Journal of computational science 8, 109-120, 2015 | 304 | 2015 |
Enhanced intelligent water drops and cuckoo search algorithms for solving the capacitated vehicle routing problem E Teymourian, V Kayvanfar, GHM Komaki, M Zandieh Information Sciences 335, 354–378, 2016 | 119 | 2016 |
Minimising makespan in the two-stage assembly hybrid flow shop scheduling problem using artificial immune systems GM Komaki, E Teymourian, V Kayvanfar International Journal of Production Research 54 (4), 963-983, 2016 | 86 | 2016 |
An integrated model for solving cell formation and cell layout problem simultaneously considering new situations I Mahdavi, E Teymourian, NT Baher, V Kayvanfar Journal of Manufacturing Systems 32 (4), 655-663, 2013 | 74 | 2013 |
Insights into TripAdvisor's online reviews: The case of Tehran's hotels R Khorsand, M Rafiee, V Kayvanfar Tourism Management Perspectives 34, 100673, 2020 | 63 | 2020 |
Minimizing total tardiness and earliness on unrelated parallel machines with controllable processing times V Kayvanfar, GHM Komaki, A Aalaei, M Zandieh Computers & Operations Research 41, 31-43, 2014 | 63 | 2014 |
Improved Discrete Cuckoo Optimization Algorithm for the Three-Stage Assembly Flowshop Scheduling Problem GM Komaki, E Teymourian, V Kayvanfar, Z Booyavi Computers & Industrial Engineering 105, 158–173, 2017 | 62 | 2017 |
Single machine scheduling with controllable processing times to minimize total tardiness and earliness V Kayvanfar, I Mahdavi, GHM Komaki Computers & Industrial Engineering 65 (1), 166-175, 2013 | 50 | 2013 |
An intelligent water drop algorithm to identical parallel machine scheduling with controllable processing times: a just-in-time approach V Kayvanfar, M Zandieh, E Teymourian Computational and Applied Mathematics 36 (1), 159–184, 2017 | 48 | 2017 |
Bi-objective intelligent water drops algorithm to a practical multi-echelon supply chain optimization problem V Kayvanfar, SMM Husseini, B Karimi, MS Sajadieh Journal of Manufacturing Systems 44, 93-114, 2017 | 43 | 2017 |
Hybrid intelligent water drops algorithm to unrelated parallel machines scheduling problem: a just-in-time approach V Kayvanfar, E Teymourian International Journal of Production Research 52 (19), 5857-5879, 2014 | 42 | 2014 |
An efficient population-based simulated annealing algorithm for 0–1 knapsack problem N Moradi, V Kayvanfar, M Rafiee Engineering with Computers 38 (3), 2771 - 2790, 2022 | 38 | 2022 |
A multi-echelon multi-product stochastic model to supply chain of small-and-medium enterprises in industrial clusters V Kayvanfar, SMM Husseini, MS Sajadieh, B Karimi Computers & Industrial Engineering 115, 69-79, 2018 | 34 | 2018 |
Demand forecasting based machine learning algorithms on customer information: an applied approach M Zohdi, M Rafiee, V Kayvanfar, A Salamiraad International Journal of Information Technology 14 (4), 1937–1947, 2022 | 33 | 2022 |
The economic lot scheduling problem with deteriorating items and shortage: an imperialist competitive algorithm V Kayvanfar, M Zandieh The International Journal of Advanced Manufacturing Technology 62, 759-773, 2012 | 32 | 2012 |
A humanitarian cold supply chain distribution model with equity consideration: The case of COVID-19 vaccine distribution in the European Union V Khodaee, V Kayvanfar, A Haji Decision Analytics Journal 4, 100126, 2022 | 31 | 2022 |
Group technology-based model and cuckoo optimization algorithm for resource allocation in cloud computing S Shahdi-Pashaki, E Teymourian, V Kayvanfar, GHM Komaki, A Sajadi IFAC-PapersOnLine 48 (3), 1140-1145, 2015 | 29 | 2015 |
A bi-objective home health care routing and scheduling model with considering nurse downgrading costs P Khodabandeh, V Kayvanfar, M Rafiee, F Werner International Journal of Environmental Research and Public Health 18 (3), 900, 2021 | 28 | 2021 |
Artificial Intelligence based Decision Support Systems in Smart Agriculture: Bibliometric Analysis for operational insights, and future directions A Yousaf, V Kayvanfar, A Mazzoni, A Elomri Frontiers in Sustainable Food Systems, 634, 2023 | 27 | 2023 |
Multi Objective Two-Stage Assembly Flow Shop with Release Time S Sheikh, GM Komaki, V Kayvanfar Computers & Industrial Engineering 124, 276-292, 2018 | 27 | 2018 |