Neural networks for cost estimation BR Setyawati, S Sahirman, RC Creese AACE International Transactions, ES131, 2002 | 73 | 2002 |
Time based automatic system of drip and sprinkler irrigation for horticulture cultivation on coastal area A Sudarmaji, S Sahirman, Saparso, Y Ramadhani IOP Conference Series: Earth and Environmental Science 250, 012074, 2019 | 19 | 2019 |
Kajian Pemanfaatan Limbah Cair Pabrik Kelapa Sawit untuk Memproduksi Gasbio S Sahirman Program Pascasarjana IPB: Bogor, 1994 | 16 | 1994 |
Neural networks for cost estimation (Part 2) BR Setyawati, RC Creese, S Sahirman AACE International Transactions, ES141, 2003 | 11 | 2003 |
The reasons for farmers not to adopt System of Rice Intensification (SRI) as a sustainable agricultural practice: an explorative study P Arsil, S Sahirman, HH Hidayat IOP Conference Series: Earth and Environmental Science 250 (1), 012063, 2019 | 8 | 2019 |
Evaluation of the economic feasibility of fiber-reinforced polymer (FRP) bridge decks S Sahirman, RC Creese, BR Setyawati Award Winning Paper. The International Society of Parametric Analysts (ISPA …, 2003 | 7 | 2003 |
Economic analysis of fiber reinforced polymer (FRP) bridge decks S Sahirman, RC Creese, HVS GangaRao, C Brown IIE Annual Conference. Proceedings, 1, 2003 | 6 | 2003 |
Preliminary Study of life-cycle Cost Model for Fiber Reinforced Polymer Bridge Deck S Sahirman, RC Creese, H GangaRao Proceedings of the 4th International Workshop on Life-Cycle Cost Analysis …, 2005 | 5 | 2005 |
Creese. RC (2002).“ BR Setyawati, S Sahirman Neural Networks for Cost Estimation.” AACE International Transactions, 13.1-13.9, 0 | 5 | |
FRP bridge deck life cycle cost analyzer S Sahirman, RC Creese, HVS GangaRao Life-Cycle Civil Engineering, 903-908, 2008 | 4 | 2008 |
Genetic algorithm for neural networks optimization BR Setyawati, RC Creese, S Sahirman Intelligent Systems in Design and Manufacturing V 5605, 54-61, 2004 | 4 | 2004 |
Assessment of tofu carbon footprint in banyumas, Indonesia-towards greener tofu S Sahirman, A Ardiansyah Proceeding of International Conference On Research, Implementation And …, 2014 | 3 | 2014 |
Fiber reinforced polymer (FRP) bridge deck life-cycle cost analysis S Sahirman West Virginia University, 2009 | 3 | 2009 |
Midlot for FRP Bridge Deck Cost Estimation S Sahirman, RC Creese, HV GangaRao, BR Setyawati AACE International Transactions, ES121, 2004 | 3 | 2004 |
Analisis kesesuaian lahan untuk padi di Distrik Semangga, Kabupaten Merauke A Ardiansyah, S SAHIRMAN, M RIF'AN, EHP Melmambessy Journal of Regional and Rural Development Planning (Jurnal Perencanaan …, 2017 | 2 | 2017 |
Estimating Life-cycle Cost of West Virginia Fiber Reinforced Polymer (FRP) Bridge Decks S Sahirman ISPA/SCEA Conference & Training Workshop, 2010 | 2 | 2010 |
A life cycle cost analyzer for bridge deck economic viability analysis S Sahirman, RC Creese, M Jaraieidi, B Gopalakrishnan, HVS GangaRao, ... IIE Annual Conference. Proceedings, 143, 2009 | 2 | 2009 |
Transportation model and techno economic as useful tools in agroindustry clustering: a case study in district Semangga, Merauke S Sahirman, M Rifan, E Melmambessy IOP Conference Series: Earth and Environmental Science 250 (1), 012058, 2019 | 1 | 2019 |
Perkiraan Carbon Footprint Industri Tahu Banyumas–Langkah Awal Menuju Industri Hijau S Sahirman Fakultas Sains dan Matematika Universitas Kristen Satya Wacana, 2014 | 1 | 2014 |
Permodelan Sistem Pertanian S Sahirman ArRazi Press, 2022 | | 2022 |