Moving forward from traditional optimization: grade uncertainty and risk effects in open-pit design R Dimitrakopoulos, CT Farrelly, M Godoy Mining Technology 111 (1), 82-88, 2002 | 354 | 2002 |
Managing risk and waste mining in long-term production scheduling of open-pit mines M Godoy, R Dimitrakopoulos SME transactions 316 (3), 2004 | 245 | 2004 |
Production scheduling with uncertain supply: a new solution to the open pit mining problem S Ramazan, R Dimitrakopoulos Optimization and engineering 14, 361-380, 2013 | 243 | 2013 |
A diversified Tabu search approach for the open-pit mine production scheduling problem with metal uncertainty A Lamghari, R Dimitrakopoulos European Journal of Operational Research 222 (3), 642-652, 2012 | 237 | 2012 |
Global optimization of open pit mining complexes with uncertainty RC Goodfellow, R Dimitrakopoulos Applied Soft Computing 40, 292-304, 2016 | 236 | 2016 |
Stochastic optimization for strategic mine planning: a decade of developments R Dimitrakopoulos Journal of Mining Science 47, 138-150, 2011 | 199 | 2011 |
Stochastic optimisation of long-term production scheduling for open pit mines with a new integer programming formulation S Ramazan, R Dimitrakopoulos Advances in applied strategic mine planning, 139-153, 2018 | 193 | 2018 |
High-order statistics of spatial random fields: exploring spatial cumulants for modeling complex non-Gaussian and non-linear phenomena R Dimitrakopoulos, H Mustapha, E Gloaguen Mathematical Geosciences 42, 65-99, 2010 | 188 | 2010 |
Evaluating mine plans under uncertainty: Can the real options make a difference? RG Dimitrakopoulos, SAA Sabour Resources Policy 32 (3), 116-125, 2007 | 188 | 2007 |
Geostatistical simulation of regionalized pore-size distributions using min/max autocorrelation factors AJ Desbarats, R Dimitrakopoulos Mathematical Geology 32, 919-942, 2000 | 182 | 2000 |
Uncertainty based production scheduling in open pit mining R Dimitrakopoulos, S Ramazan SME transactions 316, 2004 | 169 | 2004 |
Conditional simulation algorithms for modelling orebody uncertainty in open pit optimisation R Dimitrakopoulos International journal of surface mining, reclamation and environment 12 (4 …, 1998 | 165 | 1998 |
Stochastic optimisation model for open pit mine planning: application and risk analysis at copper deposit A Leite, R Dimitrakopoulos Mining Technology 116 (3), 109-118, 2007 | 163 | 2007 |
Generalized sequential Gaussian simulation on group size ν and screen-effect approximations for large field simulations R Dimitrakopoulos, X Luo Mathematical geology 36, 567-591, 2004 | 154 | 2004 |
Block simulation of multiple correlated variables A Boucher, R Dimitrakopoulos Mathematical Geosciences 41, 215-237, 2009 | 153 | 2009 |
Recent applications of operations research and efficient MIP formulations in open pit mining S Ramazan, R Dimitrakopoulos SME Transactions 316, 2004 | 152 | 2004 |
Stochastic integer programming for optimising long term production schedules of open pit mines: methods, application and value of stochastic solutions R Dimitrakopoulos, S Ramazan Mining Technology 117 (4), 155-160, 2008 | 144 | 2008 |
A maximum upside/minimum downside approach to the traditional optimization of open pit mine design R Dimitrakopoulos, L Martinez, S Ramazan Journal of mining science 43, 73-82, 2007 | 144 | 2007 |
Optimizing mining complexes with multiple processing and transportation alternatives: An uncertainty-based approach L Montiel, R Dimitrakopoulos European Journal of Operational Research 247 (1), 166-178, 2015 | 140 | 2015 |
Stochastic long-term production scheduling of iron ore deposits: Integrating joint multi-element geological uncertainty J Benndorf, R Dimitrakopoulos Journal of Mining Science 49 (1), 68-81, 2013 | 136 | 2013 |