On an index policy for restless bandits RR Weber, G Weiss Journal of applied probability 27 (3), 637-648, 1990 | 522 | 1990 |
Time-reversibility of linear stochastic processes G Weiss Journal of Applied Probability 12 (4), 831-836, 1975 | 346 | 1975 |
Stability and instability of fluid models for reentrant lines JG Dai, G Weiss Mathematics of Operations Research 21 (1), 115-134, 1996 | 309 | 1996 |
Stochastic scheduling problems I—General strategies RH Möhring, FJ Radermacher, G Weiss Zeitschrift für Operations Research 28, 193-260, 1984 | 212 | 1984 |
Shot noise models for the generation of synthetic streamflow data G Weiss Water Resources Research 13 (1), 101-108, 1977 | 191 | 1977 |
Scheduling tasks with exponential service times on non-identical processors to minimize various cost functions G Weiss, M Pinedo Journal of Applied Probability 17 (1), 187-202, 1980 | 167 | 1980 |
Stochastic scheduling problems II-set strategies RH Möhring, FJ Radermacher, G Weiss Zeitschrift für Operations Research 29, 65-104, 1985 | 146 | 1985 |
Optimal scheduling of peer-to-peer file dissemination J Mundinger, R Weber, G Weiss Journal of Scheduling 11 (2), 105-120, 2008 | 120 | 2008 |
Exact FCFS matching rates for two infinite multitype sequences I Adan, G Weiss Operations research 60 (2), 475-489, 2012 | 115 | 2012 |
FCFS infinite bipartite matching of servers and customers R Caldentey, EH Kaplan, G Weiss Advances in Applied Probability 41 (3), 695-730, 2009 | 115 | 2009 |
A simplex based algorithm to solve separated continuous linear programs G Weiss Mathematical Programming 115 (1), 151-198, 2008 | 107 | 2008 |
Branching bandit processes G Weiss Probability in the Engineering and Informational Sciences 2 (3), 269-278, 1988 | 107 | 1988 |
Multiserver stochastic scheduling G Weiss Deterministic and Stochastic Scheduling: Proceedings of the NATO Advanced …, 1982 | 86 | 1982 |
A product form solution to a system with multi-type jobs and multi-type servers J Visschers, I Adan, G Weiss Queueing Systems 70 (3), 269-298, 2012 | 84 | 2012 |
On optimal draining of re-entrant fluid lines G Weiss IMA volumes in mathematics and its applications 71, 91-91, 1995 | 80 | 1995 |
A fluid heuristic for minimizing makespan in job shops JG Dai, G Weiss Operations Research 50 (4), 692-707, 2002 | 76 | 2002 |
Stochastic bounds on distributions of optimal value functions with applications to PERT, network flows and reliability G Weiss Operations Research 34 (4), 595-605, 1986 | 74 | 1986 |
Four proofs of Gittins’ multiarmed bandit theorem E Frostig, G Weiss Annals of Operations Research 241 (1), 127-165, 2016 | 71 | 2016 |
Approximation results in parallel machnies stochastic scheduling G Weiss Annals of Operations Research 26 (1), 195-242, 1990 | 71 | 1990 |
Turnpike optimality of Smith's rule in parallel machines stochastic scheduling G Weiss Mathematics of Operations Research 17 (2), 255-270, 1992 | 67 | 1992 |