A Neuro-Fuzzy-Regression Algorithm for Improved Prediction of Manufacturing Lead Time with Machine Breakdowns SM Asadzadeh, A Azadeh, A Ziaeifar Concurrent Engineering 19 (4), 269-281, 2011 | 28 | 2011 |
Solving a new mathematical model for a hybrid flow shop scheduling problem with a processor assignment by a genetic algorithm A Ziaeifar, R Tavakkoli-Moghaddam, K Pichka The International Journal of Advanced Manufacturing Technology, 1-11, 2012 | 27 | 2012 |
Mixed-model assembly line balancing in assemble-to-order environment with considering express parallel line: problem definition and solution procedure M Rabbani, A Ziaeifar, N Manavizadeh International Journal of Computer Integrated Manufacturing 27 (7), 690-706, 2014 | 19 | 2014 |
An intelligent algorithm for optimum forecasting of manufacturing lead times in fuzzy and crisp environments A Azadeh, A Ziaeifar, K Pichka, SM Asadzadeh International Journal of Logistics Systems and Management 16 (2), 186-210, 2013 | 14 | 2013 |
A simulation optimization approach for flow-shop scheduling problem: a canned fruit industry A Azadeh, B Maleki-Shoja, M Sheikhalishahi, A Esmaili, A Ziaeifar, ... The International Journal of Advanced Manufacturing Technology 77, 751-761, 2015 | 11 | 2015 |
Open Vehicle Routing Problem Optimization under Realistic Assumptions K Pichka, B Ashjari, A Ziaeifar, N P. International Journal of Research in Industrial Engineering 3 (2), 46, 2014 | 10 | 2014 |
Relay network design with direct shipment and multi-relay assignment A Ziaeifar, H Üster Annals of Operations Research 328 (2), 1585-1614, 2023 | 2 | 2023 |