关注
Yushi Tan 檀宇石
Yushi Tan 檀宇石
Uber Technologies. Inc
在 uw.edu 的电子邮件经过验证
标题
引用次数
引用次数
年份
Combining probabilistic load forecasts
Y Wang, N Zhang, Y Tan, T Hong, DS Kirschen, C Kang
IEEE Transactions on Smart Grid 10 (4), 3664-3674, 2018
2172018
Optimal battery control under cycle aging mechanisms in pay for performance settings
Y Shi, B Xu, Y Tan, D Kirschen, B Zhang
IEEE Transactions on Automatic Control 64 (6), 2324-2339, 2018
1242018
Is machine learning in power systems vulnerable?
Y Chen, Y Tan, D Deka
2018 IEEE International Conference on Communications, Control, and Computing …, 2018
1002018
Exploiting vulnerabilities of load forecasting through adversarial attacks
Y Chen, Y Tan, B Zhang
Proceedings of the tenth ACM international conference on future energy …, 2019
912019
A convex cycle-based degradation model for battery energy storage planning and operation
Y Shi, B Xu, Y Tan, B Zhang
2018 Annual American Control Conference (ACC), 4590-4596, 2018
912018
Scheduling post-disaster repairs in electricity distribution networks
Y Tan, F Qiu, AK Das, DS Kirschen, P Arabshahi, J Wang
IEEE Transactions on Power Systems 34 (4), 2611-2621, 2019
752019
Distribution systems hardening against natural disasters
Y Tan, AK Das, P Arabshahi, DS Kirschen
IEEE Transactions on Power Systems 33 (6), 6849-6860, 2018
742018
Lagrangian relaxation with incremental proximal method for economic dispatch with large numbers of wind power scenarios
C Tang, J Xu, Y Tan, Y Sun, B Zhang
IEEE Transactions on Power Systems 34 (4), 2685-2695, 2019
342019
Incorporating unbalanced operation constraints of three-phase distributed generation
Y Tan, Z Wang
IEEE Transactions on Power Systems 34 (3), 2449-2452, 2019
222019
Vulnerabilities of power system operations to load forecasting data injection attacks
Y Chen, Y Tan, L Zhang, B Zhang
2021 IEEE International Conference on Communications, Control, and Computing …, 2021
32021
Scheduling post-disaster repairs in electricity distribution networks with uncertain repair times
Y Tan, AK Das, M Ahumada-Paras, P Arabshahi, DS Kirschen
ACM SIGMETRICS Performance Evaluation Review 47 (4), 21-24, 2020
22020
An ILP algorithm for feeder reconfiguration under capacity constraints
L Qiao, Y Tan, D Kirschen
2020 IEEE Power & Energy Society General Meeting (PESGM), 1-5, 2020
12020
Post-disaster repair scheduling in partially automated electricity distribution networks
Y Tan, AK Das, P Arabshahi, DS Kirschen
arXiv preprint arXiv:1906.06461, 2019
12019
Power System Resilience under Natural Disasters
Y Tan
12018
TB risk by time since US entry among non-US-born residents of Washington State, USA
DA Black, SW McBrien, J Gersh, B Ghassemieh, M Narita, MJ Pecha, ...
The International Journal of Tuberculosis and Lung Disease 25 (7), 560-566, 2021
2021
Affinely Adjustable Stochastic Economic Dispatch with Chance Constraints for Transmission Congestion
C Tang, Y Tant, H Qu, L Ma, T Lan
2019 IEEE Power & Energy Society General Meeting (PESGM), 1-5, 2019
2019
系统目前无法执行此操作,请稍后再试。
文章 1–16