Reliability Analysis of a hot standby industrial system SM Rizwan, V Khurana, G Taneja International Journal of Modeling and Simulation 30 (3), 315-322, 2010 | 60 | 2010 |
Reliability Analysis of Identical Two-Unit Parallel CC Plant System Operative with Full Installed Capacity AG Mathew, SM Rizwan, MC Majumder, KP Ramachandran, G Taneja International Journal of Performability Engineering 7 (2), 179-185, 2011 | 47 | 2011 |
Reliability modelling and analysis of a two unit continuous casting plant AG Mathew, SM Rizwan, MC Majumder, KP Ramachandran Journal of the Franklin Institute 348 (7), 1488-1505, 2011 | 45 | 2011 |
Profit analysis of a system with perfect repair at partial failure or complete failure SM Rizwan, G Taneja Pure and Applied Mathematika Sciences 52 (1/2), 7-14, 2000 | 38 | 2000 |
Reliability analysis of a single machine subsystem of a cable plant with six maintenance categories SM Taj, SM Rizwan, BM Alkali, DK Harrison, GL Taneja International Journal of Applied Engineering Research 12 (8), 1752-1757, 2017 | 27 | 2017 |
Reliability Analysis of Rodding Anode Plant in Aluminium Industry YA Rahbi, SM Rizwan, A Babakalli, C Andrew, T Gulshan International Journal of Applied Engineering Research 12 (16), 5616-5623, 2017 | 26 | 2017 |
Stochastic analysis of systems with accident and inspection SM Rizwan, H Chauhan, G Taneja Emirates journal for engineering research 10 (2), 81-88, 2005 | 26 | 2005 |
A general model for reliability analysis of a domestic waste water treatment plant SM Rizwan, JV Thanikal, T Michel International Journal of Condition Monitoring and Diagnostic Engineering …, 2014 | 24 | 2014 |
Reliability Analysis of a Seven Unit Desalination Plant With Shutdown During Winter Season and Repair / Maintenance on FCFS Basis SM Rizwan, P N, A Pal, G Taneja International Journal of Performability Engineering 9 (5), 523-528, 2013 | 24 | 2013 |
Reliability analysis of an evaporator of a desalination plant with online repair and emergency shutdowns N Padmavathi, SM Rizwan, A Pal, G Taneja Aryabhatta Journal of Mathematics and Informatics 4 (1), 1-12, 2012 | 23 | 2012 |
Modelling and Optimization of a Single-Unit PLC System SM Rizwan, V Khurana, G Taneja International Journal of Modelling and Simulation 27 (4), 361-368, 2007 | 23 | 2007 |
Probabilistic modeling and analysis of a cable plant subsystem with priority to repair over preventive maintenance SZ Taj, SM Rizwan, BM Alkali, DK Harrison, G Taneja i-manager’s Journal on Mathematics (JMAT) 6 (3), 12-21, 2017 | 22 | 2017 |
Comparative analysis between profits of the two models of a CC plant AG Mathew, SM Rizwan, MC Majumder, KP Ramachandran, G Taneja AIP Conference Proceedings 1298 (1), 226-231, 2010 | 22 | 2010 |
Reliability modeling of a hot standby PLC system SM Rizwan, G Taneja, V Khurana International Conference on Communication, Computer and Power (ICCCP'05 …, 2005 | 22 | 2005 |
Probabilistic analysis of a seven unit desalination plant with minor/major failures and priority given to repair over maintenance N Padmavathi, SM Rizwan, A Pal, G Taneja Aryabhatta Journal of Mathematics and Informatics 6 (1), 219-230, 2014 | 21 | 2014 |
Reliability & availability analysis of an anaerobic batch reactor treating fruit and vegetable waste SM Rizwan, JV Thanikal, N Padmavathi, H Yazidi International Journal of Applied Engineering Research 10 (24), 44075-44079, 2015 | 20 | 2015 |
Profit evaluation of a single unit CC plant with scheduled maintenance AG Mathew, SM Rizwan, MC Majumder, KP Ramachandran, T Gulshan Caledonian Journal of Engineering 5 (1), 25-33, 2009 | 20 | 2009 |
A two server system with regular repairman, who is not always available RK Tuteja, SM Rizwan, G Taneja 3rd Annual Conference of ISITA and National Symposium on Management Science …, 1999 | 20 | 1999 |
Comparative Analysis between the Reliability Models Portraying Two Operating Conditions of a Desalination Plant N Padmavathi, SM Rizwan, A Senguttuvan International Journal of Core Engineering and Management 1 (12), 1-10, 2015 | 19 | 2015 |
Probabilistic analysis of a desalination plant with major and minor failures and shutdown during winter season N Padmavathi, SM Rizwan, A Pal, G Taneja International Journal of Scientific and Statistical Computing 5 (1), 15-23, 2014 | 19 | 2014 |