关注
Yorlandys SALGADO DUARTE
Yorlandys SALGADO DUARTE
AGH University of Krakow
在 agh.edu.pl 的电子邮件经过验证
标题
引用次数
引用次数
年份
Monte Carlo simulation model to coordinate the preventive maintenance scheduling of generating units in isolated distributed Power Systems
YS Duarte, J Szpytko, AM del Castillo Serpa
Electric Power Systems Research 182, 106237, 2020
472020
A digital twins concept model for integrated maintenance: a case study for crane operation
J Szpytko, Y Salgado Duarte
Journal of Intelligent Manufacturing 32 (7), 1863-1881, 2021
372021
Digital twins model for cranes operating in container terminal
J Szpytko, YS Duarte
IFAC-PapersOnLine 52 (10), 25-30, 2019
282019
Programación óptima del mantenimiento preventivo de generadores de sistemas de potencia con presencia eólica
Y Salgado Duarte, A Martínez del Castillo Serpa, A Santos Fuentefría
Ingeniería energética 39 (3), 157-167, 2018
262018
Exploitation Efficiency System of Crane based on Risk Management.
J Szpytko, YS Duarte
IN4PL, 24-31, 2020
112020
Integrated maintenance platform for critical cranes under operation: Database for maintenance purposes
J Szpytko, YS Duarte
IFAC-PapersOnLine 53 (3), 167-172, 2020
112020
Método heurístico para la evaluación de la confiabilidad en un subsistema de líneas de transmisión
Y Salgado Duarte, AM del Castillo Serpa
Ingeniería Energética 37 (1), 3-14, 2016
52016
Technical devices degradation self-analysis for self-maintenance strategy: Crane case study
J Szpytko, YS Duarte
IFAC-PapersOnLine 54 (1), 729-736, 2021
42021
Integrated maintenance decision making platform for gantry cranes in container terminal
J Szpytko, YS Duarte
2019 24th International Conference on Methods and Models in Automation and …, 2019
42019
Assessing Impacts of Vine-Copula Dependencies: Case Study of a Digital Platform for Overhead Cranes.
J Szpytko, YS Duarte
IN4PL, 187-196, 2021
32021
Robust simulation method of complex technical transport systems
J Szpytko, Y Salgado Duarte
Transport Problems 16 (2), 2021
32021
Optimum scheduling of generator preventive maintenance of power system with wind presence
Y SALGADO, A Martinez, A Santos
Revista de Ingeniería Energética 39 (3), 157-167, 2018
32018
Heuristic method for the evaluation of the reliability in a subsystem of transmission lines
YS Duarte, AM del Castillo Serpa
Ingeniería Energética 37 (1), 3-14, 2016
32016
Maintenance activities optimization via modelling dedicated to manufacturing-distribution systems: selected case studies discussion
J Szpytko, YS Duarte, YS Duarte
IFAC-PapersOnLine 55 (10), 1588-1593, 2022
22022
Autonomous vehicles energy based operation capacity planning
J Szpytko, P Hyla, YS Duarte
Journal of Machine Engineering 20, 2020
22020
Markov chain Monte Carlo simulation model for risk assessment the power systems for electromobility use
J Szpytko, YS Duarte
Journal of KONBiN 50 (1), 15-28, 2020
22020
Liquefied Petroleum Gas Transport Service Improvement via Telematics Support
J Szpytko, LA Hurtado, YS Duarte
Development of Transport by Telematics: 19th International Conference on …, 2019
22019
Prospective Estimation of BESS Nominal Values for Frequency Control with High PV and Wind Integration
L Guerra-Hernández, AA Martínez-García, M Vilaragut-Llanes, ...
2023 27th International Conference on Methods and Models in Automation and …, 2023
12023
Modelos de radiación solar a emplear en PowerFactory para la simulación de Sistemas Fotovoltaicos
F Ygos González, M Vilaragut Llanes, A Martínez García, ...
Ingeniería Energética 43 (2), 19-26, 2022
12022
Solar generation estimation in electric power systems for prospective frequency control studies
A Martínez-García, O Torres-Breffe, M Vilaragut-Llanes, ...
TransNav, International Journal on Marine Navigation and Safety od Sea …, 2022
12022
系统目前无法执行此操作,请稍后再试。
文章 1–20