Reserve estimation of an open pit mine under price uncertainty by real option approach AD Akbari, M Osanloo, MA Shirazi Mining Science and Technology (China) 19 (6), 709-717, 2009 | 50 | 2009 |
Minable reserve estimation while determining ultimate pit limits (UPL) under price uncertainty by real option approach (ROA) AD Akbari, M Osanloo, MA Shirazi Archives of Mining Sciences 54 (2), 321-339, 2009 | 30 | 2009 |
Selecting post mining land use through analytical hierarchy processing method: case study in Sungun copper open pit mine of Iran AD Akbari, M Osanloo, H Hamidian Proc. of the fifteen Int. Symposium on Mine Planning and Equipment Selection …, 2006 | 26 | 2006 |
Exfoliated graphitic carbon nitride for the fast adsorption of metal ions from acid mine drainage: a case study from the Sungun copper mine D Akbari Mine Water and the Environment (Internet) 38 (2), 335-341, 2019 | 21 | 2019 |
Determination of ultimate pit limits in open mines using real option approach AD Akbari, M Osanlou, MA Shirazi INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE (ENGLISH) 19 (15), 23-38, 2008 | 19 | 2008 |
Ultimate Pit Limit (UPL) determination through minimizing risk costs associated with price uncertainty AD Akbari, M Osanloo, MA Shirazi Gospodarka Surowcami Mineralnymi 24 (4/2), 157-170, 2008 | 13 | 2008 |
Plant type selection for reclamation of Sarcheshmeh copper mine by fuzzy-TOPSIS method I Alavia, A Akbarib, H Alinejad-Roknyc Advanced Engineering Technology and Application 1 (1), 8-12, 2012 | 11 | 2012 |
Governing risk elements through open pit slope optimization M Golestanifar, K Ahangari, K Goshtasbi, A Akbari Dehkharghani, ... Journal of the Southern African Institute of Mining and Metallurgy 118 (1 …, 2018 | 9 | 2018 |
An Updated and Modified O’Hara Cost Estimating Model Based on World and Iran Economic Condition ADAM Osanloo APCOM, 2005 | 8 | 2005 |
A model to calculate blasting costs using hole diameter, uniaxial compressive strength, and joint set orientation A Ghanizadeh Zarghami, K Shahriar, K Goshtasbi, A Akbari Journal of the Southern African Institute of Mining and Metallurgy 118 (8 …, 2018 | 7 | 2018 |
Plant Type Selection for Sarcheshmeh Copper Mine Reclamation by Fuzzy-AHP Method A Akbari World Mining Conference (WMC) 2011, 2011 | 7 | 2011 |
Comparative study on the removal of toxic metal ions by advanced carbon allotropes and g-C3N4 adsorbents: a case study from Sarcheshmeh copper mine A Akbari Dehkharghani Environmental Earth Sciences 78 (22), 640, 2019 | 6 | 2019 |
Application of KKT in determining the final destination of mined material in multi-processing mines E Rahimi, A Akbari Resources Policy 50, 10-18, 2016 | 6 | 2016 |
Effect of copper slag recovery on hydrometallurgical cut-off grades considering environmental aspects A Akbari, E Rahimi Journal of Central South University 23, 798-807, 2016 | 6 | 2016 |
Suggested method for tailing dam site selection with Analytical Hierarchy Processing (AHP): case study in coal washery tailing dam of Anjirtange plant-Savadkooh-Iran A Akbari, M Osanloo, H Hamidian proceeding of application of computers and operations research in the …, 2007 | 6 | 2007 |
Copper price prediction using wave count with contribution of elliott waves R Satari, A Akbari Dehkharghani, K Ahangari Journal of Mining and Environment 11 (3), 825-835, 2020 | 5 | 2020 |
Hormangan site: New evidence for Neolithic Occupations in the southern Zagros, Iran M Khanipour, H Emadi, A Akbari Neo-Lithics 18, 17-23, 2018 | 5 | 2018 |
Real option theory and some key points for using it in mining AD Akbari, M Osanloo, MA Shirazi 16th MPES, 1-12, 2007 | 4 | 2007 |
Modelling the factors of mine production planning considering the risk free valuation and new cut-off grades algorithm AA Dehkharghani gospodarka surowcami mineralnymi – mineral resources management 34 (2), 81–96, 2018 | 3 | 2018 |
A New Technical and Economic Model to Calculate Specific Charge and Specific Drilling Using Hole Diameter, Bench Height, Uniaxial Compressive Strength, and Joint Set Orientation A Ghanizadeh Zarghami, K Shahriar, K Goshtasbi, ... Journal of Mining and Environment 11 (4), 991-1005, 2020 | 2 | 2020 |