A multi-objective scheduling payment pattern for project cash flow by considering resource constraints (a case study in power transfer system) RK I Emami, YV Geshniani International Journal of Industrial and Systems Engineering 35, 299-313, 2020 | 9 | 2020 |
A fuzzy DEMATEL–Fuzzy Binary Logistic Regression approach to evaluate and prioritize risks and simulated annealing optimization algorithm R Hashemi, R Kamranrad, F Bagheri, I Emami International Journal of Managing Projects in Business, 2020 | 5 | 2020 |
Project scheduling optimization for contractor’s Net present value maximization using meta-heuristic algorithms: A case study M Zaree, R Kamranrad, M Zaree, I Emami Journal of Industrial Engineering and Management Studies 7 (2), 36-55, 2020 | 4 | 2020 |
Location and Allocation in Multi-Level Supply Chain Network of Projects I Emami, R Kamran Rad, E Jokar Journal of Quality Engineering and Production Optimization 6 (1), 49-70, 2021 | | 2021 |
Cost Optimization in Portfolio Supply Chain Network for Procurement Phase EJ Iman Emami 15th International Project Management Conference, 2020 | | 2020 |
Location and allocation decisions for multi-echelon supply chain network by a multi objectives evolutionary approach MOHPSO J I.Emami, R.Kamranrad, E 5th International Conference of Industrial and Systems Engineering (ICISE 2019), 2019 | | 2019 |