关注
Inoka Withana Gamage
Inoka Withana Gamage
Senior Associate Contracts Manager
在 jacobs.com 的电子邮件经过验证
标题
引用次数
引用次数
年份
An investigation into the impact of procurement systems on waste generation: the contractors' perspective
Gamage, I.S.W. Osmani, M., Glass, J.
25th Annual ARCOM Conference, 1031-1040, 2009
28*2009
Significant factors influencing the bid mark-up decision of infrastructure projects in Sri Lanka
B Perera, M Wijewickrama, W Ranaweera, ISW Gamage
International Journal of Construction Management 21 (8), 769-783, 2021
222021
MACRO LEVEL FACTORS AFFECTING THE CONSTRUCTION PROCUREMENT SELECTION: A MULTI CRITERIA MODEL
S Ratnasabapathy, R Rameezdeen, I Gamage
Joint International Conference on Construction Culture, Innovation and …, 2006
192006
A waste minimisation framework for the procurement of design and build construction projects
ISW Gamage
Unpublished Ph D Thesis, Loughborough University, Loughborough, 2011
82011
Assessing the Relationship between Procurement Systems and Waste Generation in Construction
Gamage, I.S.W., Osmani, M. and Glass, J.
Third Scottish Conference for Postgraduate Researchers of the Built and …, 2007
7*2007
A waste minimization framework for the procurement of design and build construction projects
IS Withana-Gamage
Loughborough University, 2011
62011
Factors Affecting Construction Procurement Selection: A Study of Client Requirements and Project Characteristics
ISW Gamage
University of Moratuwa, 2005
22005
Cost Management of Building Construction Projects
T Jayawickrama, R Jayasinghe, R Kahandawa, R Rameezdeen, ...
Building Cost Planning: Best Practices and Insights, 2024
2024
Building Information Modeling: Reshaping Professional Practices of Quantity Surveying
ISW Gamage
2013
RESEARCH APPROACH TO INVESTIGATE THE RELATIONSHIP BETWEEN WASTE GENERATION AND PROCUREMENT SYSTEMS
ISW Gamage, M Osmani, J Glass
ARCOM DOCTORAL WORKSHOP, 1-7, 2008
2008
系统目前无法执行此操作,请稍后再试。
文章 1–10