Production planning of a hybrid manufacturing–remanufacturing system under uncertainty within a closed-loop supply chain JP Kenné, P Dejax, A Gharbi International Journal of Production Economics 135 (1), 81-93, 2012 | 363 | 2012 |
Production and preventive maintenance rates control for a manufacturing system: an experimental design approach A Gharbi, JP Kenné International journal of production economics 65 (3), 275-287, 2000 | 160 | 2000 |
Integrated production, sampling quality control and maintenance of deteriorating production systems with AOQL constraint B Bouslah, A Gharbi, R Pellerin Omega 61, 110-126, 2016 | 148 | 2016 |
Age-dependent production planning and maintenance strategies in unreliable manufacturing systems with lost sale JP Kenné, A Gharbi, M Beit European Journal of Operational Research 178 (2), 408-420, 2007 | 122 | 2007 |
Maintenance scheduling and production control of multiple-machine manufacturing systems A Gharbi, JP Kenné Computers & industrial engineering 48 (4), 693-707, 2005 | 119 | 2005 |
Joint production, quality and maintenance control of a two-machine line subject to operation-dependent and quality-dependent failures B Bouslah, A Gharbi, R Pellerin International Journal of Production Economics 195, 210-226, 2018 | 110 | 2018 |
Simultaneous control of production, repair/replacement and preventive maintenance of deteriorating manufacturing systems FID Nodem, JP Kenné, A Gharbi International Journal of Production Economics 134 (1), 271-282, 2011 | 109 | 2011 |
Control of production and corrective maintenance rates in a multiple-machine, multiple-product manufacturing system JP Kenné, EK Boukas, A Gharbi Mathematical and computer modelling 38 (3-4), 351-365, 2003 | 105 | 2003 |
Optimal safety stocks and preventive maintenance periods in unreliable manufacturing systems A Gharbi, JP Kenne, M Beit International Journal of Production Economics 107 (2), 422-434, 2007 | 99 | 2007 |
Optimal scheduling of a two-stage hybrid flow shop M Haouari, L Hidri, A Gharbi Mathematical Methods of Operations Research 64 (1), 107-124, 2006 | 96 | 2006 |
Minimizing makespan on parallel machines subject to release dates and delivery times A Gharbi, M Haouari Journal of scheduling 5 (4), 329-355, 2002 | 96 | 2002 |
Joint optimal production control/preventive maintenance policy for imperfect process manufacturing cell K Dhouib, A Gharbi, MNB Aziza International Journal of Production Economics 137 (1), 126-136, 2012 | 93 | 2012 |
The complexity of base station positioning in cellular networks C Glaßer, S Reith, H Vollmer Discrete Applied Mathematics 148 (1), 1-12, 2005 | 93 | 2005 |
Joint optimal lot sizing and production control policy in an unreliable and imperfect manufacturing system B Bouslah, A Gharbi, R Pellerin International Journal of Production Economics 144 (1), 143-156, 2013 | 88 | 2013 |
Stohastic optimal production control problem with corrective maintenance JP Kenné, A Gharbi Computers & industrial engineering 46 (4), 865-875, 2004 | 80 | 2004 |
Joint optimization of production and maintenance strategies considering a dynamic sampling strategy for a deteriorating system H Rivera-Gómez, A Gharbi, JP Kenné, O Montaño-Arango, ... Computers & industrial engineering 140, 106273, 2020 | 76 | 2020 |
Experimental design in production and maintenance control problem of a single machine, single product manufacturing system JP Kenne, A Gharbi International Journal of Production Research 37 (3), 621-637, 1999 | 76 | 1999 |
Optimal production control problem in stochastic multiple-product multiple-machine manufacturing systems A Gharbi, JP Kenne IIE transactions 35 (10), 941-952, 2003 | 75 | 2003 |
A simulation optimization approach in production planning of failure prone manufacturing systems JP Kenne, A Gharbi Journal of intelligent manufacturing 12, 421-431, 2001 | 69 | 2001 |
Joint production and major maintenance planning policy of a manufacturing system with deteriorating quality H Rivera-Gómez, A Gharbi, JP Kenné International Journal of Production Economics 146 (2), 575-587, 2013 | 68 | 2013 |