Cognitive Buildings LC Tagliabue, I Yitmen MDPI 1, 266, 2022 | 383* | 2022 |
Preparing construction supply chains for blockchain technology: An investigation of its potential and future directions A Tezel, E Papadonikolaki, I Yitmen, P Hilletofth Frontiers of Engineering Management, 2020 | 149 | 2020 |
Digital twin-based progress monitoring management model through reality capture to extended reality technologies (DRX) S Alizadehsalehi, I Yitmen Smart and Sustainable Built Environment, 2021 | 148 | 2021 |
The effectiveness of an integrated BIM/UAV model in managing safety on construction sites S Alizadehsalehi, I Yitmen, T Celik, D Arditi International journal of occupational safety and ergonomics 26 (4), 829-844, 2020 | 142 | 2020 |
An Adapted Model of Cognitive Digital Twins for Building Lifecycle Management I Yitmen, S Alizadehsalehi, I Akiner, ME Akiner Applied Sciences 11 (9), 4276, 2021 | 107 | 2021 |
Organizational cultural intelligence: A competitive capability for strategic alliances in the international construction industry I Yitmen Project Management Journal 44 (4), 5-25, 2013 | 107 | 2013 |
Insights into Blockchain Implementation in Construction: Models for Supply Chain Management A Tezel, P Febrero, E Papadonikolaki, I Yitmen Journal of Management in Engineering 37 (4), 2021 | 104 | 2021 |
Intellectual capital: a competitive asset for driving innovation in engineering design firms I Yitmen Engineering Management Journal 23 (2), 3-19, 2011 | 102 | 2011 |
A Concept for Automated Construction Progress Monitoring: Technologies Adoption for Benchmarking Project Performance Control S Alizadehsalehi, I Yitmen Arabian Journal for Science and Engineering, 2018 | 99 | 2018 |
Compression Specific Toughness of Normal Strength Steel Fiber Reinforced Concrete (NSSFRC) and High Strength Steel Fiber Reinforced Concrete (HSSFRC) K Marar, O Eren, I Yitmen MATERIALS RESEARCH-IBERO-AMERICAN JOURNAL OF MATERIALS 14 (2), 239-247, 2011 | 88 | 2011 |
Stakeholder engagement in mega transport infrastructure projects M Erkul, I Yitmen, T Çelik Procedia Engineering 161, 704-710, 2016 | 85 | 2016 |
The challenge of change for innovation in construction: A North Cyprus perspective I Yitmen Building and environment 42 (3), 1319-1328, 2007 | 85 | 2007 |
An investigation for integration of deep learning and digital twins towards Construction 4.0 M Kor, I Yitmen, S Alizadehsalehi Smart and Sustainable Built Environment, 2022 | 83 | 2022 |
Modeling and analysis of the impact of BIM-based field data capturing technologies on automated construction progress monitoring S Alizadeh Salehi, İ Yitmen International Journal of Civil Engineering 16, 1669-1685, 2018 | 78 | 2018 |
The impact of field data capturing technologies on automated construction project progress monitoring S Alizadehsalehi, I Yitmen Procedia engineering 161, 97-103, 2016 | 76 | 2016 |
Enhancing Student Engagement: Harnessing “AIED”’s Power in Hybrid Education - A Review Analysis A Almusaed, A Almssad, I Yitmen, ZR Homod Education Sciences 13, 632, 2023 | 73 | 2023 |
Exploring applicability, interoperability and integrability of Blockchain-based digital twins for asset life cycle management CS Götz, P Karlsson, I Yitmen Smart and Sustainable Built Environment, 2020 | 71 | 2020 |
Environmental Profile on Building Material Passports for Hot Climates A Almusaed, A Almssad, R Z. Homod, I Yitmen Sustainability 12 (9), 2020 | 67 | 2020 |
Advances in Informatics and Computing in Civil and Construction Engineering: Proceedings of the 35th CIB W78 2018 Conference: IT in Design, Construction, and Management I Mutis, T Hartmann 35th CIB W78 2018 Conference: IT in Design, Construction, and Management 1 …, 2018 | 66 | 2018 |
Cognitive Digital Twins for Facilitating Construction 4.0: Challenges and Opportunities for Implementation I Yitmen, I Kovacic, LC Tagliabue Frontiers in Built Environment 9 (Special Issue), 2, 2023 | 58* | 2023 |