A survey of the assembly line balancing procedures E Erel, SC Sarin Production Planning & Control 9 (5), 414-434, 1998 | 580 | 1998 |
The machine loading and tool allocation problem in a flexible manufacturing system SC Sarin, CS Chen International Journal of Production Research 25 (7), 1081-1094, 1987 | 252 | 1987 |
A methodology for solving single-model, stochastic assembly line balancing problem SC Sarin, E Erel, EM Dar-El Omega 27 (5), 525-535, 1999 | 134 | 1999 |
A survey of dispatching rules for operational control in wafer fabrication SC Sarin, A Varadarajan, L Wang Production Planning and Control 22 (1), 4-24, 2011 | 122 | 2011 |
New tighter polynomial length formulations for the asymmetric traveling salesman problem with and without precedence constraints SC Sarin, HD Sherali, A Bhootra Operations research letters 33 (1), 62-70, 2005 | 115 | 2005 |
A review of lot streaming M Cheng, NJ Mukherjee, SC Sarin International Journal of Production Research 51 (23-24), 7023-7046, 2013 | 107 | 2013 |
Design, modeling, and analysis of a feedstock logistics system JD Judd, SC Sarin, JS Cundiff Bioresource technology 103 (1), 209-218, 2012 | 98 | 2012 |
A heuristic to minimize total flow time in permutation flow shop D Laha, SC Sarin Omega 37 (3), 734-739, 2009 | 93 | 2009 |
Flexible manufacturing systems: a review of modeling approaches for design, justification and operation MV Kalkunte, SC Sarin, WE Wilhelm Flexible manufacturing systems: Methods and studies, 3-25, 1986 | 85 | 1986 |
A near-optimal heuristic for the sequencing problem in multiple-batch flow-shops with small equal sublots AA Kalir, SC Sarin Omega 29 (6), 577-584, 2001 | 82 | 2001 |
Flow shop lot streaming SC Sarin, P Jaiprakash Springer Science & Business Media, 2007 | 79 | 2007 |
Models and algorithms for a two-stage production process HD Sherali, SC SARIN, MS KODIALAM Production Planning & Control 1 (1), 27-39, 1990 | 77 | 1990 |
Evaluation of the potential benefits of lot streaming in flow-shop systems AA Kalir, SC Sarin International Journal of Production Economics 66 (2), 131-142, 2000 | 76 | 2000 |
Optimal allocation of work in assembly lines for lots with homogenous learning Y Cohen, G Vitner, SC Sarin European Journal of Operational Research 168 (3), 922-931, 2006 | 74 | 2006 |
Sequencing jobs on a single machine with a common due date and stochastic processing times SC Sarin, E Erel, G Steiner European Journal of Operational Research 51 (2), 188-198, 1991 | 72 | 1991 |
The long-term mine production scheduling problem SC Sarin, J West-Hansen IIE Transactions 37 (2), 109-121, 2005 | 71 | 2005 |
Pricing and production planning for reverse supply chain: a review DW Steeneck, SC Sarin International Journal of Production Research 51 (23-24), 6972-6989, 2013 | 68 | 2013 |
Scheduling heuristic for the n-jobm-machine flow shop S Sarin, M Lefoka Omega 21 (2), 229-234, 1993 | 66 | 1993 |
A class of lifted path and flow-based formulations for the asymmetric traveling salesman problem with and without precedence constraints HD Sherali, SC Sarin, PF Tsai Discrete Optimization 3 (1), 20-32, 2006 | 65 | 2006 |
Joint-advertising for collection of returned products in a closed-loop supply chain under uncertain environment SK Jena, SP Sarmah, SC Sarin Computers & Industrial Engineering 113, 305-322, 2017 | 64 | 2017 |