关注
Subhash C. Sarin
Subhash C. Sarin
Paul T. Norton Endowed Professor, Virginia Tech
在 vt.edu 的电子邮件经过验证 - 首页
标题
引用次数
引用次数
年份
A survey of the assembly line balancing procedures
E Erel, SC Sarin
Production Planning & Control 9 (5), 414-434, 1998
5801998
The machine loading and tool allocation problem in a flexible manufacturing system
SC Sarin, CS Chen
International Journal of Production Research 25 (7), 1081-1094, 1987
2521987
A methodology for solving single-model, stochastic assembly line balancing problem
SC Sarin, E Erel, EM Dar-El
Omega 27 (5), 525-535, 1999
1341999
A survey of dispatching rules for operational control in wafer fabrication
SC Sarin, A Varadarajan, L Wang
Production Planning and Control 22 (1), 4-24, 2011
1222011
New tighter polynomial length formulations for the asymmetric traveling salesman problem with and without precedence constraints
SC Sarin, HD Sherali, A Bhootra
Operations research letters 33 (1), 62-70, 2005
1152005
A review of lot streaming
M Cheng, NJ Mukherjee, SC Sarin
International Journal of Production Research 51 (23-24), 7023-7046, 2013
1072013
Design, modeling, and analysis of a feedstock logistics system
JD Judd, SC Sarin, JS Cundiff
Bioresource technology 103 (1), 209-218, 2012
982012
A heuristic to minimize total flow time in permutation flow shop
D Laha, SC Sarin
Omega 37 (3), 734-739, 2009
932009
Flexible manufacturing systems: a review of modeling approaches for design, justification and operation
MV Kalkunte, SC Sarin, WE Wilhelm
Flexible manufacturing systems: Methods and studies, 3-25, 1986
851986
A near-optimal heuristic for the sequencing problem in multiple-batch flow-shops with small equal sublots
AA Kalir, SC Sarin
Omega 29 (6), 577-584, 2001
822001
Flow shop lot streaming
SC Sarin, P Jaiprakash
Springer Science & Business Media, 2007
792007
Models and algorithms for a two-stage production process
HD Sherali, SC SARIN, MS KODIALAM
Production Planning & Control 1 (1), 27-39, 1990
771990
Evaluation of the potential benefits of lot streaming in flow-shop systems
AA Kalir, SC Sarin
International Journal of Production Economics 66 (2), 131-142, 2000
762000
Optimal allocation of work in assembly lines for lots with homogenous learning
Y Cohen, G Vitner, SC Sarin
European Journal of Operational Research 168 (3), 922-931, 2006
742006
Sequencing jobs on a single machine with a common due date and stochastic processing times
SC Sarin, E Erel, G Steiner
European Journal of Operational Research 51 (2), 188-198, 1991
721991
The long-term mine production scheduling problem
SC Sarin, J West-Hansen
IIE Transactions 37 (2), 109-121, 2005
712005
Pricing and production planning for reverse supply chain: a review
DW Steeneck, SC Sarin
International Journal of Production Research 51 (23-24), 6972-6989, 2013
682013
Scheduling heuristic for the n-jobm-machine flow shop
S Sarin, M Lefoka
Omega 21 (2), 229-234, 1993
661993
A class of lifted path and flow-based formulations for the asymmetric traveling salesman problem with and without precedence constraints
HD Sherali, SC Sarin, PF Tsai
Discrete Optimization 3 (1), 20-32, 2006
652006
Joint-advertising for collection of returned products in a closed-loop supply chain under uncertain environment
SK Jena, SP Sarmah, SC Sarin
Computers & Industrial Engineering 113, 305-322, 2017
642017
系统目前无法执行此操作,请稍后再试。
文章 1–20