A Simulated Annealing algorithm for a mixed model assembly U-line balancing type-I problem considering human efficiency and Just-In-Time approach N Manavizadeh, N Hosseini, M Rabbani, F Jolai Computers & industrial engineering 64 (2), 669-685, 2013 | 139 | 2013 |
Balancing of mixed-model two-sided assembly lines with multiple U-shaped layout M Rabbani, M Moghaddam, N Manavizadeh The International Journal of Advanced Manufacturing Technology 59, 1191-1210, 2012 | 86 | 2012 |
Mixed model U-line balancing type-1 problem: A new approach M Rabbani, SM Kazemi, N Manavizadeh Journal of Manufacturing Systems 31 (2), 131-138, 2012 | 64 | 2012 |
Mixed-model assembly line balancing in the make-to-order and stochastic environment using multi-objective evolutionary algorithms N Manavizadeh, M Rabbani, D Moshtaghi, F Jolai Expert Systems with Applications 39 (15), 12026-12031, 2012 | 62 | 2012 |
A multi-objective mixed-model assembly line sequencing problem in order to minimize total costs in a Make-To-Order environment, considering order priority N Manavizadeh, L Tavakoli, M Rabbani, F Jolai Journal of Manufacturing Systems 32 (1), 124-137, 2013 | 39 | 2013 |
A new multi-objective approach in order to balancing and sequencing U-shaped mixed model assembly line problem: a proposed heuristic algorithm N Manavizadeh, M Rabbani, F Radmehr The International Journal of Advanced Manufacturing Technology 79, 415-425, 2015 | 36 | 2015 |
A novel two-stage framework for reducing ergonomic risks of a mixed-model parallel U-shaped assembly-line M Mokhtarzadeh, M Rabbani, N Manavizadeh Applied Mathematical Modelling 93, 597-617, 2021 | 33 | 2021 |
Order acceptance/rejection policies in determining the sequence in mixed model assembly lines N Manavizadeh, AH Goodarzi, M Rabbani, F Jolai Applied Mathematical Modelling 37 (4), 2531-2551, 2013 | 32 | 2013 |
Designing a multi-objective model for a hazardous waste routing problem considering flexibility of routes and social effects E Araee, N Manavizadeh, S Aghamohammadi Bosjin Journal of Industrial and Production Engineering 37 (1), 33-45, 2020 | 27 | 2020 |
Multi-objective optimization algorithms for mixed model assembly line balancing problem with parallel workstations M Rabbani, R Siadatian, H Farrokhi-Asl, N Manavizadeh Cogent Engineering 3 (1), 1158903, 2016 | 21 | 2016 |
Solving a bi-objective cell formation problem with stochastic production quantities by a two-phase fuzzy linear programming approach M Rabbani, F Jolai, N Manavizadeh, F Radmehr, B Javadi The International Journal of Advanced Manufacturing Technology 58, 709-722, 2012 | 21 | 2012 |
Using a metaheuristic algorithm for solving a home health care routing and scheduling problem N Manavizadeh, H Farrokhi-Asl, P Beiraghdar Journal of Project Management 5 (1), 27-40, 2020 | 20 | 2020 |
Proactive and reactive inventory policies in humanitarian operations M Rabbani, N Manavizadeh, M Samavati, M Jalali Uncertain Supply Chain Management 3 (3), 253-272, 2015 | 20 | 2015 |
Mixed-model assembly line balancing in assemble-to-order environment with considering express parallel line: problem definition and solution procedure M Rabbani, A Ziaeifar, N Manavizadeh International Journal of Computer Integrated Manufacturing 27 (7), 690-706, 2014 | 19 | 2014 |
Using Robust-DEA optimization approach to analyze performance and efficiency of a mine in north of Iran M Rabbani, H Farrokhi-Asl, N Manavizadeh Management Science Letters 7 (2), 97-110, 2017 | 18 | 2017 |
A constraint programming approach and a hybrid of genetic and K-means algorithms to solve the p-hub location-allocation problems M Rabbani, M Mokhtarzadeh, N Manavizadeh International Journal of Management Science and Engineering Management 16 (2 …, 2021 | 14 | 2021 |
A novel bi-level hierarchy towards available-to-promise in mixed-model assembly line sequencing problems M Rabbani, S Sadri, N Manavizadeh, H Rafiei Engineering Optimization 47 (7), 947-962, 2015 | 13 | 2015 |
A stochastic model for indirect condition monitoring using proportional covariate model M Rabani, N Manavizadeh, S Balali INTERNATIONAL JOURNAL OF ENGINEERING 21 (1), 45-56, 2008 | 13 | 2008 |
Robust optimization approach to production system with failure in rework and breakdown under uncertainty: evolutionary methods M Rabbani, N Manavizadeh, NS Hosseini Aghozi Assembly Automation 35 (1), 81-93, 2015 | 12 | 2015 |
Simultaneous balancing and worker assignment problem for mixed-model assembly lines in a make-to-order environment considering control points and assignment restrictions F Tanhaie, M Rabbani, N Manavizadeh Journal of Modelling in Management 15 (1), 1-34, 2020 | 11 | 2020 |