Filtered and recovering beam search algorithms for the early/tardy scheduling problem with no idle time JMS Valente, RAFS Alves Computers & Industrial Engineering 48 (2), 363-375, 2005 | 90 | 2005 |
Beam search algorithms for the single machine total weighted tardiness scheduling problem with sequence-dependent setups JMS Valente, RAFS Alves Computers & Operations Research 35 (7), 2388-2405, 2008 | 87 | 2008 |
Iterated-greedy-based algorithms with beam search initialization for the permutation flowshop to minimise total tardiness V Fernandez-Viagas, JMS Valente, JM Framinan Expert Systems with Applications 94, 58-69, 2018 | 76 | 2018 |
A genetic algorithm approach for the single machine scheduling problem with linear earliness and quadratic tardiness penalties JMS Valente, JF Gonçalves Computers & Operations Research 36 (10), 2707-2715, 2009 | 74 | 2009 |
Improved heuristics for the early/tardy scheduling problem with no idle time JMS Valente, RAFS Alves Computers & Operations Research 32 (3), 557-569, 2005 | 73 | 2005 |
What catches the eye in class observation? Observers’ perspectives in a multidisciplinary peer observation of teaching program AC Torres, A Lopes, JMS Valente, A Mouraz Teaching in Higher Education 22 (7), 822-838, 2017 | 62 | 2017 |
A comparison of metaheuristic procedures to schedule jobs in a permutation flow shop to minimise total earliness and tardiness J Schaller, JMS Valente International Journal of Production Research 51 (3), 772-779, 2013 | 50 | 2013 |
An exact approach to early/tardy scheduling with release dates JMS Valente, RAFS Alves Computers & operations research 32 (11), 2905-2917, 2005 | 50 | 2005 |
Heuristics for the early/tardy scheduling problem with release dates JMS Valente, RAFS Alves International Journal of Production Economics 106 (1), 261-274, 2007 | 43 | 2007 |
Heuristics for the single machine scheduling problem with quadratic earliness and tardiness penalties JMS Valente, RAFS Alves Computers & Operations Research 35 (11), 3696-3713, 2008 | 41 | 2008 |
Heuristics for the single machine scheduling problem with early and quadratic tardy penalties JMS Valente European Journal of Industrial Engineering 1 (4), 431-448, 2007 | 40 | 2007 |
Genetic algorithms for single machine scheduling with quadratic earliness and tardiness costs JMS Valente, MRA Moreira, A Singh, RAFS Alves The International Journal of Advanced Manufacturing Technology 54 (1-4), 251-265, 2011 | 33 | 2011 |
Improved lower bounds for the early/tardy scheduling problem with no idle time JMS Valente, RAFS Alves Journal of the Operational Research Society 56 (5), 604-612, 2005 | 33 | 2005 |
Dispatching heuristics for the single machine weighted quadratic tardiness scheduling problem JMS Valente, JE Schaller Computers & Operations Research 39 (9), 2223-2231, 2012 | 30 | 2012 |
Heuristics for scheduling jobs in a permutation flow shop to minimize total earliness and tardiness with unforced idle time allowed J Schaller, JMS Valente Expert Systems with Applications 119, 376-386, 2019 | 29 | 2019 |
A hybrid genetic algorithm for the early/tardy scheduling problem JMS Valente, JF Gonçalves, RAFS Alves Asia-Pacific Journal of operational research 23 (03), 393-405, 2006 | 28 | 2006 |
Improved heuristics for the single machine scheduling problem with linear early and quadratic tardy penalties JMS Valente, JE Schaller European Journal of Industrial Engineering 4 (1), 99-129, 2010 | 27 | 2010 |
Beam search heuristics for quadratic earliness and tardiness scheduling JMS Valente Journal of the Operational Research Society 61 (4), 620-631, 2010 | 26 | 2010 |
An evolutionary model of industry dynamics and firms’ institutional behavior with job search, bargaining and matching ST Silva, JMS Valente, AAC Teixeira Journal of Economic Interaction and Coordination 7 (1), 23-61, 2012 | 24 | 2012 |
Beam search heuristics for the single machine scheduling problem with linear earliness and quadratic tardiness costs JMS Valente Asia-Pacific Journal of Operational Research 26 (03), 319-339, 2009 | 24 | 2009 |