Multi-level lot sizing and job shop scheduling with compressible process times: A cutting plane approach M Karimi-Nasab, SM Seyedhoseini European Journal of Operational Research 231 (3), 598-616, 2013 | 59 | 2013 |
A self-adaptive PSO for joint lot sizing and job shop scheduling with compressible process times M Karimi-Nasab, M Modarres, SM Seyedhoseini Applied Soft Computing 27, 137-147, 2015 | 53 | 2015 |
An inventory control model with stochastic review interval and special sale offer M Karimi-Nasab, I Konstantaras European Journal of Operational Research 227 (1), 81-87, 2013 | 39 | 2013 |
Developing approximate algorithms for EPQ problem with process compressibility and random error in production/inspection M Karimi-Nasab, K Sabri-Laghaie International Journal of Production Research 52 (8), 2388-2421, 2014 | 36 | 2014 |
A random search heuristic for a multi-objective production planning M Karimi-Nasab, I Konstantaras Computers & Industrial Engineering 62 (2), 479-490, 2012 | 33 | 2012 |
Lot sizing and job shop scheduling with compressible process times: A cut and branch approach M Karimi-Nasab, M Modarres Computers & Industrial Engineering 85, 196-205, 2015 | 32 | 2015 |
An artificial bee colony algorithm for a two-stage hybrid flowshop scheduling problem with multilevel product structures and requirement operations O Kheirandish, R Tavakkoli-Moghaddam, M Karimi-Nasab International Journal of Computer Integrated Manufacturing 28 (5), 437-450, 2015 | 30 | 2015 |
Multi-objective production scheduling with controllable processing times and sequence-dependent setups for deteriorating items M Karimi-Nasab, SMT Fatemi Ghomi International Journal of Production Research 50 (24), 7378-7400, 2012 | 30 | 2012 |
A multi-objective production smoothing model with compressible operating times M Karimi-Nasab, MB Aryanezhad Applied Mathematical Modelling 35 (7), 3596-3610, 2011 | 29 | 2011 |
A group decision-making approach for supplier selection in configuration design: A case study S Dowlatshahi, M Karimi-Nasab, H Bahrololum The International Journal of Advanced Manufacturing Technology 81 (5), 1139–1154, 2015 | 22 | 2015 |
Multi-period lot sizing and job shop scheduling with compressible process times for multilevel product structures M Karimi-Nasab, SM Seyedhoseini, M Modarres, M Heidari International Journal of Production Research 51 (20), 6229-6246, 2013 | 16 | 2013 |
An economic production quantity model with random yield subject to process compressibility E Noorollahi, M Karimi-Nasab, MB Aryanezhad Mathematical and Computer Modelling 56 (3-4), 80-96, 2012 | 16 | 2012 |
An inventory model with truncated exponential replenishment intervals and special sale offer M Karimi-Nasab, HM Wee Journal of Manufacturing Systems 35, 246-250, 2015 | 15 | 2015 |
Multi-objective optimisation for pricing and distribution in a supply chain with stochastic demands M Karimi-Nasab, D Shishebori, SGR Jalali-Naini International Journal of Industrial and Systems Engineering 13 (1), 56-72, 2013 | 15 | 2013 |
A two-phase heuristic algorithm for designing reliable capacitated logistics networks under disruptions D Shishebori, M Karimi-Nasab, LV Snyder European Journal of Industrial Engineering 11 (4), 425-468, 2017 | 13 | 2017 |
A Multiobjective Distribution-Pricing Model for Multiperiod Price-Sensitive Demands M Karimi-Nasab, S Dowlatshahi, H Heidari IEEE Transactions on Engineering Management 60 (3), 640-654, 2013 | 13 | 2013 |
Random search algorithms for redundancy allocation problem of a queuing system with maintenance considerations K Sabri-Laghaie, M Karimi-Nasab Reliability Engineering & System Safety 185, 144-162, 2019 | 11 | 2019 |
A fuzzy random multi-objective approach for portfolio selection MB Aryanezhad, H Malekly, M Karimi-Nasab JOURNAL OF INDUSTRIAL ENGINEERING INTERNATIONAL 7 (13), 12-21, 2011 | 9 | 2011 |
Multiple batch sizing through batch size smoothing MB Aryanezhad, M Karimi-Nasab, S Bakhshi JOURNAL OF OPTIMIZATION IN INDUSTRIAL ENGINEERING (JOURNAL OF INDUSTRIAL …, 2009 | 5 | 2009 |
A multi-objective approach for production smoothing problem MB Aryanezhad, M Karimi-Nasab PROCEEDINGS OF INTERNATIONAL CONFERENCE OF IRANIAN OPERATIONS RESEARCH SOCIETY, 2009 | 4 | 2009 |