Competitive two-agent scheduling and its applications JYT Leung, M Pinedo, G Wan Operations Research 58 (2), 458-469, 2010 | 225 | 2010 |
Tabu search for single machine scheduling with distinct due windows and weighted earliness/tardiness penalties G Wan, BPC Yen European Journal of Operational Research 142 (2), 271-281, 2002 | 181 | 2002 |
Including subjective norm and technology trust in the technology acceptance model: a case of e-ticketing in China C Lee, G Wan ACM SIGMIS Database: The DATABASE for Advances in Information Systems 41 (4 …, 2010 | 157 | 2010 |
Automatic multilabel electrocardiogram diagnosis of heart rhythm or conduction abnormalities with deep learning: a cohort study YY Hongling Zhu, Cheng Cheng, Hang Yin, Xingyi Li, Ping Zuo, Jia Ding, Fan ... Lancet Digital Health 2, e348–57, 2020 | 143 | 2020 |
Parallel machine selection and job scheduling to minimize machine cost and job tardiness D Cao, M Chen, G Wan Computers & operations research 32 (8), 1995-2012, 2005 | 114 | 2005 |
Scheduling two agents with controllable processing times G Wan, SR Vakati, JYT Leung, M Pinedo European Journal of Operational Research 205 (3), 528-539, 2010 | 112 | 2010 |
Managing appointment-based services in the presence of walk-in customers S Wang, N Liu, G Wan Management Science 66 (2), 667-686, 2020 | 75 | 2020 |
Financing and coordinating the supply chain with a capital-constrained supplier under yield uncertainty W Ding, G Wan International journal of production economics 230, 107813, 2020 | 58 | 2020 |
Home service routing and appointment scheduling with stochastic service times Y Zhan, Z Wang, G Wan European Journal of Operational Research 288 (1), 98-110, 2021 | 56 | 2021 |
Single machine scheduling to minimize total weighted earliness subject to minimal number of tardy jobs G Wan, BPC Yen European Journal of Operational Research 195 (1), 89-97, 2009 | 55 | 2009 |
The effect of financing on a budget-constrained supply chain under wholesale price contract X Chen, G Wan Asia-Pacific Journal of Operational Research 28 (04), 457-485, 2011 | 53 | 2011 |
A note on appointment scheduling with piecewise linear cost functions D Ge, G Wan, Z Wang, J Zhang Mathematics of Operations Research 39 (4), 1244-1251, 2014 | 49 | 2014 |
Single machine scheduling to minimize total compression plus weighted flow cost is NP-hard G Wan, BPC Yen, CL Li Information Processing Letters 79 (6), 273-280, 2001 | 48 | 2001 |
Vehicle routing and appointment scheduling with team assignment for home services Y Zhan, G Wan Computers & operations research 100, 1-11, 2018 | 47 | 2018 |
Scheduling with variable time slot costs G Wan, X Qi Naval Research Logistics (NRL) 57 (2), 159-171, 2010 | 43 | 2010 |
Multi‐level, multi‐stage lot‐sizing and scheduling in the flexible flow shop with demand information updating G Wan, Y Zhan International Transactions in Operational Research 28 (4), 2191-2217, 2021 | 31 | 2021 |
Single machine bicriteria scheduling: a survey PC Benjamin, WAN Guohua International Journal of Industrial Engineering 10 (3), 222-231, 2003 | 27 | 2003 |
Resource-constrained machine scheduling with machine eligibility restriction and its applications to surgical operations scheduling S Wang, H Su, G Wan Journal of Combinatorial Optimization 30, 982-995, 2015 | 26 | 2015 |
Integrated order selection and production scheduling under MTO strategy S Huang, M Lu, G Wan International Journal of Production Research 49 (13), 4085-4101, 2011 | 26 | 2011 |
Parallel machine scheduling with eligibility constraints: A composite dispatching rule to minimize total weighted tardiness H Su, M Pinedo, G Wan Naval Research Logistics (NRL) 64 (3), 249-267, 2017 | 19 | 2017 |