关注
Jordi Pereira
Jordi Pereira
UPF - Barcelona School of Management
在 bsm.upf.edu 的电子邮件经过验证 - 首页
标题
引用次数
引用次数
年份
Ant algorithms for a time and space constrained assembly line balancing problem
J Bautista, J Pereira
European journal of operational research 177 (3), 2016-2032, 2007
2912007
Modeling the problem of locating collection areas for urban waste management. An application to the metropolitan area of Barcelona
J Bautista, J Pereira
Omega 34 (6), 617-629, 2006
2242006
Solving an urban waste collection problem using ants heuristics
J Bautista, E Fernández, J Pereira
Computers & Operations Research 35 (9), 3020-3033, 2008
1822008
A dynamic programming based heuristic for the assembly line balancing problem
J Bautista, J Pereira
European Journal of Operational Research 194 (3), 787-794, 2009
1532009
A branch-and-bound algorithm for assembly line worker assignment and balancing problems
M Vila, J Pereira
Computers & Operations Research 44, 105-114, 2014
1412014
Ant algorithms for assembly line balancing
J Bautista, J Pereira
International Workshop on Ant Algorithms, 65-75, 2002
1372002
Genetic variability and geographic differentiation among three species of Triatomine bugs (Himiptera-Reduviidae)
F Panzera, S Hornos, J Pereira, R Cestau, D Canale, L Diotaiuti, ...
Am. J. Trop Med. Hyg., 1997
1001997
An exact approach for the robust assembly line balancing problem
J Pereira, E Álvarez-Miranda
Omega 78, 85-98, 2018
812018
A GRASP algorithm to solve the unicost set covering problem
J Bautista, J Pereira
Computers & Operations Research 34 (10), 3162-3173, 2007
722007
A memetic algorithm for the cost-oriented robotic assembly line balancing problem
J Pereira, M Ritt, ÓC Vásquez
Computers & Operations Research 99, 249-261, 2018
662018
The robust set covering problem with interval data
J Pereira, I Averbakh
Annals of Operations Research 207, 217-235, 2013
612013
Exact and heuristic algorithms for the interval data robust assignment problem
J Pereira, I Averbakh
Computers & Operations Research 38 (8), 1153-1163, 2011
602011
The flowtime network construction problem
I Averbakh, J Pereira
Iie Transactions 44 (8), 681-694, 2012
582012
The robust (minmax regret) assembly line worker assignment and balancing problem
J Pereira
Computers & Operations Research 93, 27-40, 2018
572018
The robust (minmax regret) single machine scheduling with interval processing times and total weighted completion time objective
J Pereira
Computers & Operations Research 66, 141-152, 2016
562016
Recomendaciones prácticas para el manejo perioperatorio del paciente con sospecha o infección grave por coronavirus SARS-CoV-2
AM Feijoo, E Maseda, RA Bartolomé, G Aguilar, RG de Castro, ...
Revista Española de Anestesiología y Reanimación 67 (5), 253-260, 2020
512020
On the complexity of assembly line balancing problems
E Álvarez-Miranda, J Pereira
Computers & Operations Research 108, 182-186, 2019
462019
Models and procedures for electric energy distribution planning. A review
R Sempértegui, J Bautista, RG Cubero, J Pereira
IFAC Proceedings Volumes 35 (1), 395-400, 2002
452002
Ant algorithms for urban waste collection routing
J Bautista, J Pereira
International Workshop on Ant Colony Optimization and Swarm Intelligence …, 2004
432004
Procedures for the time and space constrained assembly line balancing problem
J Bautista, J Pereira
European Journal of Operational Research 212 (3), 473-481, 2011
422011
系统目前无法执行此操作,请稍后再试。
文章 1–20