A hybrid multi-objective genetic algorithm based on the ELECTRE method for a capacitated flexible job shop scheduling problem M Rohaninejad, A Kheirkhah, P Fattahi, B Vahedi-Nouri The International Journal of Advanced Manufacturing Technology 77, 51-66, 2015 | 66 | 2015 |
A hybrid learning-based meta-heuristic algorithm for scheduling of an additive manufacturing system consisting of parallel SLM machines M Rohaninejad, R Tavakkoli-Moghaddam, B Vahedi-Nouri, Z Hanzálek, ... International Journal of Production Research 60 (20), 6205-6225, 2022 | 32 | 2022 |
Two hybrid tabu search–firefly algorithms for the capacitated job shop scheduling problem with sequence-dependent setup cost M Rohaninejad, AS Kheirkhah, B Vahedi Nouri, P Fattahi International Journal of Computer Integrated Manufacturing 28 (5), 470-487, 2015 | 31 | 2015 |
Simultaneous lot-sizing and scheduling in flexible job shop problems M Rohaninejad, A Kheirkhah, P Fattahi The International Journal of Advanced Manufacturing Technology 78, 1-18, 2015 | 31 | 2015 |
Incorporating order acceptance, pricing and equity considerations in the scheduling of cloud manufacturing systems: matheuristic methods B Vahedi-Nouri, R Tavakkoli-Moghaddam, Z Hanzálek, H Arbabi, ... International Journal of Production Research 59 (7), 2009-2027, 2021 | 28 | 2021 |
Minimizing the total completion time on a single machine with the learning effect and multiple availability constraints B Vahedi-Nouri, P Fattahi, M Rohaninejad, R Tavakkoli-Moghaddam Applied Mathematical Modelling 37 (5), 3126-3137, 2013 | 28 | 2013 |
An accelerated Benders decomposition algorithm for reliable facility location problems in multi-echelon networks M Rohaninejad, R Sahraeian, R Tavakkoli-Moghaddam Computers & Industrial Engineering 124, 523-534, 2018 | 27 | 2018 |
A new approach to cooperative competition in facility location problems: Mathematical formulations and an approximation algorithm M Rohaninejad, H Navidi, BV Nouri, R Kamranrad Computers & Operations Research 83, 45-53, 2017 | 26 | 2017 |
Multi-objective optimization of integrated lot-sizing and scheduling problem in flexible job shops M Rohaninejad, R Sahraeian, BV Nouri RAIRO-Operations Research 50 (3), 587-609, 2016 | 26 | 2016 |
Multi-echelon supply chain design considering unreliable facilities with facility hardening possibility M Rohaninejad, R Sahraeian, R Tavakkoli-Moghaddam Applied Mathematical Modelling 62, 321-337, 2018 | 19 | 2018 |
A multi-objective scheduling model for a cloud manufacturing system with pricing, equity, and order rejection B Vahedi-Nouri, R Tavakkoli-Moghaddam, M Rohaninejad IFAC-PapersOnLine 52 (13), 2177-2182, 2019 | 15 | 2019 |
Integrated lot-sizing and scheduling: Mitigation of uncertainty in demand and processing time by machine learning M Rohaninejad, M Janota, Z Hanzálek Engineering Applications of Artificial Intelligence 118, 105676, 2023 | 12 | 2023 |
Scheduling of parallel 3D-printing machines with incompatible job families: A matheuristic algorithm M Rohaninejad, Z Hanzálek, R Tavakkoli-Moghaddam IFIP International Conference on Advances in Production Management Systems …, 2021 | 11 | 2021 |
Heuristic methods based on MINLP formulation for reliable capacitated facility location problems M Rohaninejad, AH AMIRI, M Bashiri INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION RESEARCH …, 2015 | 10 | 2015 |
Artificial Intelligence of Things (AIoT) Strategies for a Smart Sustainable-Resilient Supply Chain H Nozari, R Tavakkoli-Moghaddam, M Rohaninejad, Z Hanzalek IFIP International Conference on Advances in Production Management Systems …, 2023 | 9 | 2023 |
Minimising the total cost of tardiness and overtime in a resumable capacitated job shop scheduling problem by using an efficient hybrid algorithm M Rohaninejad, R Sahraeian, BV Nouri International Journal of Industrial and Systems Engineering 26 (3), 318-343, 2017 | 7 | 2017 |
Redundancy resource allocation for reliable project scheduling: A game-theoretical approach M Rohaninejad, R Tavakkoli-Moghaddam, B Vahedi-Nouri Procedia Computer Science 64, 265-273, 2015 | 7 | 2015 |
Multi-level lot-sizing and job shop scheduling with lot-streaming: Reformulation and solution approaches M Rohaninejad, Z Hanzálek International Journal of Production Economics 263, 108958, 2023 | 5 | 2023 |
Coordinated bidding of multi-product charging station in electricity markets using rolling planning and sample average approximation F Sohrabi, M Rohaninejad, MR Hesamzadeh, J Bemš International Journal of Electrical Power & Energy Systems 146, 108786, 2023 | 5 | 2023 |
A new model for integrated lot sizing and scheduling in flexible job shop problem R Sahraeian, M Rohaninejad, M Fadavi Journal of Industrial and Systems Engineering 10 (3), 72-91, 2017 | 5 | 2017 |