Root Cause Analysis of the Most Frequent Claims in the Building Industry through the SCoP3E Ishikawa Diagram M Parchami Jalal, E Noorzai, T Yavari Roushan Journal of Legal Affairs and Dispute Resolution in Engineering and …, 2019 | 43 | 2019 |
A BIM-based construction claim management model for early identification and visualization of claims MP Jalal, TY Roushan, E Noorzai, M Alizadeh Smart and Sustainable Built Environment 10 (2), 227-257, 2020 | 42 | 2020 |
Contractual risks of BIM implementation and the proposed contract form for DBB and DB projects A Mahdian, M Parchami Jalal, T Yavari Roushan Journal of Legal Affairs and Dispute Resolution in Engineering and …, 2023 | 8 | 2023 |
Liability in BIM projects—Preliminary review results K Taghizadeh, T Yavari Roushan, M Alizadeh International Journal of Architectural Computing, 1-15, 2022 | 6 | 2022 |
Cooperative game theory solution to design liability assignment issues in BIM projects K Taghizadeh, M Alizadeh, T Yavari Roushan Journal of Construction Engineering and Management 147 (9), 04021103, 2021 | 6 | 2021 |