Economic viability of building integrated photovoltaics: A review of forty-five (45) non-domestic buildings in twelve (12) western countries R Weerasinghe, RJ Yang, R Wakefield, E Too, T Le, R Corkish, S Chen, ... Renewable and Sustainable Energy Reviews 137, 110622, 2021 | 44 | 2021 |
Digitalizing building integrated photovoltaic (BIPV) conceptual design: A framework and an example platform RJ Yang, ST Imalka, WMP Wijeratne, G Amarasinghe, N Weerasinghe, ... Building and Environment 243, 110675, 2023 | 16 | 2023 |
Renewable energy adoption in the built environment: a sociotechnical network approach RPNP Weerasinghe, RJ Yang, E Too, T Le Intelligent Buildings International 13 (1), 33-50, 2021 | 15 | 2021 |
Building management system for sustainable built environment in Sri Lanka W Kumara, K Waidyasekara, R Weerasinghe Built Environment Project and Asset Management, 2016 | 13 | 2016 |
Collaborative facilities management model: Sri Lankan perspective R Weerasinghe, YG Sandanayake Built Environment Project and Asset Management, 2017 | 12 | 2017 |
Relationally integrated value networks (RIVANS) for total facilities management (TFM) N De Silva, R Weerasinghe, HWN Madhusanka, M Kumaraswamy Built Environment Project and Asset Management, 2017 | 12 | 2017 |
Learning from success: A machine learning approach to guiding solar building envelope applications in non-domestic market NP Weerasinghe, RJ Yang, C Wang Journal of Cleaner Production 374, 133997, 2022 | 10 | 2022 |
Enablers of relational integrated value networks (RIVANS) for total facilities management (TFM) N De Silva, N Weerasinghe, HWN Madhusanka, M Kumaraswamy Journal of Financial Management of Property and Construction, 2018 | 10 | 2018 |
Project-based learning for proactive skills development of postgraduate students in solar energy building design digitalisation C Gunarathna, R Yang, P Wijeratne Mudiyanselage, G Amarasinghe, ... Smart and Sustainable Built Environment, 2023 | 9 | 2023 |
Industry attractiveness of Outsourced facilities management services in Sri Lanka R Weerasinghe, D Disanayake, AK Andarawera | 7 | 2016 |
Prefabricated building integrated photovoltaics: cost and deployment J Yang, R Wakefield, MAC Gunarathna, RPN Weerasinghe Royal Institution of Chartered Surveyors (RICS) Research Trust, 2019 | 5 | 2019 |
Multi-dimensional evaluation of BIPV installations: Development of a tool to assess the performance as building component and electricity generator HR Wilson, F Frontini, P Bonomo, GC Eder, M Babin, S Thorsteinsson, ... Energy and Buildings 312, 114207, 2024 | 4 | 2024 |
Cost reduction and deployment of prefabricated building integrated photovoltaics RJ Yang, R Wakefield, C Gunarathna, N Weerasinghe London: Royal Institution of Chartered Surveyors (RICS), 2019 | 4 | 2019 |
Modelling economic viability of facade-integrated photovoltaic applications in non-domestic buildings N Weerasinghe, R Yang Asia-Pacific Solar Research Conference, 3-5, 2019 | 4 | 2019 |
Collaborative Facilities Management in urban regeneration projects: problems and potentials YG Weerasinghe R.P.N.P., Bandusena, A.B.P.P. and Sandanayake 2nd International Conference on 'Cities, People and Places, Department of …, 2014 | 3* | 2014 |
An investigation of integrated facilities management functions in Sri Lanka R Weerasinghe, YG Sandanayake | 2 | 2013 |
Integrated facilities management practices in Sri Lanka: a preliminary investigation R Weerasinghe, YG Sandanayake Ceylon Institute of Builders, 2013 | 2 | 2013 |
Demystifying the socio-technical context of deploying distributed PV systems within the building industry RJY N. Weerasinghe Proceedings of 22nd International Conference on Advancement of Construction …, 2017 | 1 | 2017 |
Green Construction Project Stakeholder Management C Gunarathna, N Weerasinghe, R Yang, S Jayasuriya Developing a Body of Knowledge for Green Construction Project Management …, 2025 | | 2025 |
Leveraging deep learning techniques for condition assessment of stormwater pipe network AN Yussuf, NP Weerasinghe, H Chen, L Hou, D Herath, M Rashid, ... Journal of Civil Structural Health Monitoring, 1-15, 2024 | | 2024 |