BIM handbook: A guide to building information modeling for owners, designers, engineers, contractors, and facility managers R Sacks, C Eastman, G Lee, P Teicholz John Wiley & Sons, 2018 | 1132 | 2018 |
Specifying parametric building object behavior (BOB) for a building information modeling system G Lee, R Sacks, CM Eastman Automation in construction 15 (6), 758-776, 2006 | 671 | 2006 |
Parametric 3D modeling in building construction with examples from precast concrete R Sacks, CM Eastman, G Lee Automation in construction 13 (3), 291-312, 2004 | 377 | 2004 |
Where to focus for successful adoption of building information modeling within organization J Won, G Lee, C Dossick, J Messner Journal of construction engineering and management 139 (11), 04013014, 2013 | 346 | 2013 |
Quantification of construction waste prevented by BIM-based design validation: Case studies in South Korea J Won, JCP Cheng, G Lee Waste Management 49, 170-180, 2016 | 220 | 2016 |
The status of BIM adoption on six continents W Jung, G Lee International Journal of Civil and Environmental Engineering 9 (5), 512-516, 2015 | 201 | 2015 |
D3 City project—Economic impact of BIM-assisted design validation G Lee, HK Park, J Won Automation in Construction 22, 577-586, 2012 | 196 | 2012 |
A BIM-and sensor-based tower crane navigation system for blind lifts G Lee, J Cho, S Ham, T Lee, G Lee, SH Yun, HJ Yang Automation in construction 26, 1-10, 2012 | 168 | 2012 |
An analysis of BIM jobs and competencies based on the use of terms in the industry M Uhm, G Lee, B Jeon Automation in Construction 81, 67-98, 2017 | 136 | 2017 |
Process model perspectives on management and engineering procedures in the precast/prestressed concrete industry R Sacks, CM Eastman, G Lee Journal of construction engineering and management 130 (2), 206-215, 2004 | 123 | 2004 |
A laser-technology-based lifting-path tracking system for a robotic tower crane G Lee, HH Kim, CJ Lee, SI Ham, SH Yun, H Cho, BK Kim, GT Kim, K Kim Automation in Construction 18 (7), 865-874, 2009 | 120 | 2009 |
How to tell if a BIM project is successful: A goal-driven approach J Won, G Lee Automation in Construction 69, 34-43, 2016 | 116 | 2016 |
A target benchmark of the impact of three-dimensional parametric modeling in precast construction R Sacks, CM Eastman, G Lee, D Orndorff PCI journal 50 (4), 126, 2005 | 105 | 2005 |
Process, productivity, and economic analyses of BIM–based multi-trade prefabrication—A case study S Jang, G Lee Automation in Construction 89, 86-98, 2018 | 89 | 2018 |
Automated classification of building information modeling (BIM) case studies by BIM use based on natural language processing (NLP) and unsupervised learning N Jung, G Lee Advanced Engineering Informatics 41, 100917, 2019 | 80 | 2019 |
Parallel vs. sequential cascading MEP coordination strategies: A pharmaceutical building case study G Lee Automation in Construction 43, 170-179, 2014 | 79 | 2014 |
Case studies of BIM in use T Olofsson, G Lee, C Eastman Electronic journal of information technology in construction 13, 244-245, 2008 | 74 | 2008 |
Eliciting information for product modeling using process modeling G Lee, CM Eastman, R Sacks Data & Knowledge Engineering 62 (2), 292-307, 2007 | 74 | 2007 |
Extended Process to Product Modeling (xPPM) for integrated and seamless IDM and MVD development G Lee, YH Park, S Ham Advanced engineering informatics 27 (4), 636-651, 2013 | 68 | 2013 |
Usability principles and best practices for the user interface design of complex 3D architectural design and engineering tools G Lee, CM Eastman, T Taunk, CH Ho International journal of human-computer studies 68 (1-2), 90-104, 2010 | 67 | 2010 |